Building consents
Building consents in Lake Hāwea
Below: 351 consents we hold in Lake Hāwea, searchable and on the map.
Consents on record in Lake Hāwea
Individual building consents we hold, each on its property: 351 from 1 Jul 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes108
41 in the last 12 months · typically $471k
- Alterations and additions44
14 in the last 12 months · typically $80k
- Fires and heating36
13 in the last 12 months · typically $5,000
- Garages, sheds and carports24
6 in the last 12 months · typically $93k
- Minor dwellings and sleepouts11
3 in the last 12 months · typically $126k
- Relocated buildings8
typically $88k
- Pools and spas5
1 in the last 12 months · typically $15k
- Plumbing, drainage and wastewater3
2 in the last 12 months · typically $55k
- Commercial alterations2
typically $225k
- Decks, pergolas and verandahs2
typically $120k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.3mAlterations to existing 2 bdrm cottage & extension of 2 storey wing. 16 Capell Avenue, Lake Hāwea
- $1.2mConstruction & associated earthworks for a single level dwg 94 Watkins Road, Hāwea Flat
- $1mConstruction of a single storey multi-unit dwg with attached gge. 13 Dingle Street, Lake Hāwea
- $1mNew 4 bdrm res dwg with attached dbl gge 24 Lachlan Avenue, Hāwea Flat
- $902kConstruction of single storey multi-unit dwg with attached gge 19 Longview Drive, Lake Hāwea
351 consents
- New homes$453k
To erect a new dwg with attached gge
- Alterations and additions$120k
Two bdrm, one bathrm extension to the eastern side of the existing house
- New homes$450k
Construct new res dwg
- New homes$449k
New 3 bdrm dwg with attached single gge
- New homes$620k
To erect a new dwg with attached gge & solid fuel fire with attached unit
- Fires and heating$7,400
Alt to 2-storey dwg: install metro mega rad leg on exisiting tile hearth with wetback, eco flue kit, & flexible roof flashing
- New homes$280k
Construction of single level detached dwg with attached dbl gge
- Minor dwellings and sleepouts$180k
New 2 level, 2 bdrm sleepout with axon wall cladding
- Other new buildings$200k
New res flat
- Fires and heating$6,000
New metro wee rad leg burner. Metro eco 4.2m flue kit. Pan flashing with dekitie #7
- New homes$596k
Construction of a single storey dwg with separate gge.
- Alterations and additions$11k
Amendment 01 - change of cladding on lounge extension to schist cladding
- Alterations and additions$25k
Am 01 - new internal stair providing access from second floor to non-habitable loft
- New homes$1.2m
Construction & associated earthworks for a single level dwg
- New homes$280k
Construction of a single storey detached dwg with associated earthworks & services
- New homes$1m
Construction of a single storey multi-unit dwg with attached gge.
- Alterations and additions$10k
Installation of two new soak pits to site
- New homes$500k
Construction of a new res dwg with 3 bedrooms & detached gge
- New homes$658k
Construct new res dwg
- Fires and heating$7,200
Alt to single storey dwg: install new metro wee rad base, eco flue kits, installation, flexibleble roof boot over pan flashing
- New homes$493k
Dinex: construction of single level detached dwg with attached dbl gge
- New homes$278k
Dinex - construction of single level detached dwg with no gge
- New homes$362k
Single storey 4 bdrm domestic dwg with attached gge
- Plumbing, drainage and wastewater$120k
Renovation of existing dwg including plumbing works. Housing - detached dwgs
- Fires and heating$5,000
Install new free-standing woodburner
ResidentialCommercial The dots are this page of the list.
Suburbs in Lake Hāwea
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.