Building consents
Residential building consents in Lake Tekapo
Below: 131 residential consents we hold in Lake Tekapo, searchable and on the map.
Residential consents on record in Lake Tekapo
Individual building consents we hold, each on its property: 131 from 1 Aug 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes38
9 in the last 12 months · typically $815k
- Alterations and additions15
6 in the last 12 months · typically $100k
- Fires and heating15
2 in the last 12 months · typically $6,000
- Minor dwellings and sleepouts6
1 in the last 12 months · typically $200k
- Garages, sheds and carports6
typically $175k
- Other new buildings6
typically $843k
- Multiple homes4
2 in the last 12 months · typically $535k
- Repairs, recladding and strengthening2
2 in the last 12 months · typically $33k
- Plumbing, drainage and wastewater1
typically $50k
- Relocated buildings1
typically $12k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.2mErect one two-storey main dwg & attached two-storey 28 Mistake Drive, Lake Tekapo
- $1.1mConstruction of new 2 storey dwg with 3 bedrooms 28 Station Bay Rise, Lake Tekapo
- $875kErect 1 single storey main dwg & 1 attached minor 9 Coulson Lane, Lake Tekapo
- $663kErect single-storey self-contained dwg with attached 13 Edwards Lane, Lake Tekapo
- $620k2 x 2 bdrm domestic dwgs 6 Esther Hope Street, Lake Tekapo
131 consents
- Minor dwellings and sleepouts$250k
Erect a detached single storey minor unit dwg.
- Alterations and additions$100k
Foundations & site works for unit 4 of development at 15
- Alterations and additions$48k
Alt to dwg - add of bdrm
- New homes$1.2m
Erect one two-storey main dwg & attached two-storey
- New homes$875k
Erect 1 single storey main dwg & 1 attached minor
- Multiple homes$620k
2 x 2 bdrm domestic dwgs
- New homes$599k
Two storey 3 bdrm domestic dwg with attached gge
- New homes$1.1m
Construction of new 2 storey dwg with 3 bedrooms
- Alterations and additions$50k
2bdrm transportable to be sited at 15 aorangi cres
- Alterations and additions$100k
Res renovation including replacing exterior windows
- New homes$250k
Transportable 2 bdrm detached dwg
- Alterations and additions$220k
Proposed alterations to existing home
- New homes$250k
New 2 bdrm transportable home built & inspected
- New homes$250k
New 2 bdrm transportable home built & inspected
- Fires and heating$3,000
Woodsman uleb freestanding logburner 1 murray place Kaiapoi lot 14 dp 30922
- New homes$663k
Erect single-storey self-contained dwg with attached
- Fires and heating$6,000
Solid fuel heater
- New homes$200k
Transportable, single storey 2 bdrm domestic dwg
- Alterations and additions$15k
Bearer to pile connection details. Transportable cabins
- Repairs, recladding and strengthening$35k
Exterior reclad
- Repairs, recladding and strengthening$30k
Excavation & pouring of timber piles overseen by geo tech
- Multiple homes$450k
To construct two timber framed dwgs
- Garages, sheds and carports$300k
Alterations to existing dwg. Newly built gge
- New homes$1.1m
Construction of new 3 bdrm, two storey in part, house
- Garages, sheds and carports$120k
To construct new free standing gge
ResidentialCommercial The dots are this page of the list.
Suburbs in Lake Tekapo
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.