Building consents
Commercial building consents in Linkwater
Below: 36 commercial consents we hold in Linkwater, searchable and on the map.
Commercial consents on record in Linkwater
Individual building consents we hold, each on its property: 36 from 1 Mar 2026 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations1
1 in the last 12 months · typically $51k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $51kGge/pottery workshop 32 Tirimoana Terrace, Anakiwa
36 consents
- Commercial alterations$51k
Gge/pottery workshop
- Farm buildings
Implement Shed
- New commercial buildings
Two Motel Units/Tourist Flats
- Commercial alterations
Extensions to Sunday School Room and Service Areas
- Commercial alterations
Workshop
- Commercial alterations
Addition
- Commercial alterations
Garage/Workshop
- Commercial alterations
Garage/Workshop
- Commercial alterations
Fire Station
- Farm buildings
Extension to Existing Implement Shed
- Commercial alterations
Replace Existing Wood Framed Workshop with Metal Framed "Total Span" Building
- Commercial alterations
Pole Frame Shed
- Fit-outs
Fitout Of Existing Shed, New Amenities Building with Septic Tank, Wash Down Pit and Soak Pit
- Commercial alterations
Storage Shed
- Commercial alterations
Alterations To Community Hall
- Commercial alterations
Workshop/Storage Building
- Commercial alterations
Alterations To Visitor Accommodation Facilities
- Commercial alterations
Workshop
- Commercial alterations
Storage Shed & Workshop
- Farm buildings
Two Bay Implement Shed
- Commercial alterations
Alterations
- Commercial alterations
New Reception Area and Additions/Alterations to Ablution Block
- Commercial alterations
Stormwater Drainage Work, Alterations to Door Opening & Free-Standing Metro Xtreme Rad Log Fire
- Commercial alterations
Extensions & Alterations to Linkwater Hall
- Commercial alterations
Addition of Toilet Cubicle to Existing Changing Sheds & Associated Drainage Work
ResidentialCommercial The dots are this page of the list.
Suburbs in Linkwater
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.