Below: 2 commercial consents we hold in Mangatāwhiri, searchable and on the map.

Consents we hold21 in the last 12 monthsSearch them ↓

Commercial consents on record in Mangatāwhiri

Individual building consents we hold, each on its property: 2 from 1 Sep 2020 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Commercial alterations1

    1 in the last 12 months · typically $19k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

00111202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 0July 2024: 0August 2024: 0September 2024: 0October 2024: 0November 2024: 0December 2024: 0January 2025: 0February 2025: 0March 2025: 0April 2025: 0May 2025: 0June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 1April 2026: 0May 2026: 0June 2026: 0July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $19kAlterations to existing gge/workshop to include new bathrm, remove pa door & change gge door to bifold door 146 Lyons Road, Mangatāwhiri

2 consents

  1. Commercial alterations$19k

    Alterations to existing gge/workshop to include new bathrm, remove pa door & change gge door to bifold door

    146 Lyons Road, Mangatāwhiri · 1 Mar 2026 · BLD0762/26

  2. Relocated buildings$180k

    Relocation of two existing office buildings to be transformed into a dwg. Construction of covered decks, carport & dbl gge with associated effluent disposal area & storm water system

    420 Bell Road, Mangatāwhiri · 1 Sep 2020 · BLD0245/21

ResidentialCommercial The dots are this page of the list.

Suburbs in Mangatāwhiri

Where the consents we hold are, most in the last 12 months first.

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?