Building consents
Building consents in Taupō Bay
Below: 30 consents we hold in Taupō Bay, searchable and on the map.
Consents on record in Taupō Bay
Individual building consents we hold, each on its property: 30 from 1 Sep 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes7
1 in the last 12 months · typically $500k
- Alterations and additions6
typically $195k
- Plumbing, drainage and wastewater2
1 in the last 12 months · typically $22k
- Garages, sheds and carports2
1 in the last 12 months · typically $130k
- Minor dwellings and sleepouts2
typically $17k
- Multiple homes1
typically $1.3m
- Decks, pergolas and verandahs1
typically $80k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $500kNew dwg, & alterations to ex 50 Marlin Drive
- $190kIwan gge to be built on site con 31 Marlin Drive
- $20kNew secondary wastewater treatment 18 Taupo Bay Road
30 consents
- New homes$500k
New dwg, & alterations to ex
- Plumbing, drainage and wastewater$20k
New secondary wastewater treatment
- Garages, sheds and carports$190k
Iwan gge to be built on site con
- Alterations and additions$300k
Alterations to existing dwg
- Alterations and additions$1.5m
Alterations & additions, replace
- Alterations and additions$400k
Extension & alt to existing dwg
- Alterations and additions$15k
Upgrade of fire system from current sprinkler system to hard wired monitor smoke system
- New homes$650k
Detached dwg install a freesta
- Alterations and additions$90k
Installation of tied-back timber poles with balustrades
- Minor dwellings and sleepouts$30k
Create new studio/games room
- New homes$350k
New dwg with onsite wastewater
- Multiple homes$1.3m
Rbw detached res dwg lot 1, lot 2 & lot 3 duplex res dwgs new 3 x two storey dwg, including bedrooms, bathrooms, kitchen, dining, living & single gge. & private drainage.
- Decks, pergolas and verandahs$80k
Rbw. Second storey deck replacement.
- Garages, sheds and carports$70k
Construct a gge
- Plumbing, drainage and wastewater$24k
Replace wastewater field
- New homes$800k
prefabricated dwg
- Alterations and additions$3,000
Install wagner sparky free-standing
- New homes$480k
Dent dwg - prefabricated singl
- New homes$2m
New detached dwg.
- New homes$450k
New 3 bdrm dwg with freesta
- Minor dwellings and sleepouts$3,000
Install of a warmington studio free
- Decks, pergolas and verandahs$150k
Extension to kitchen & deck
- New homes$516k
Dwg with attached gge. ...
- New homes$600k
New 3 bdrm dwg with detached gge. ...
- Fires and heating$3,000
Install of a masport r1200 ped free
ResidentialCommercial The dots are this page of the list.
Near Taupō Bay
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.