Building consents
Commercial building consents in Marlborough Sounds
Below: 155 commercial consents we hold in Marlborough Sounds, searchable and on the map.
Commercial consents on record in Marlborough Sounds
Individual building consents we hold, each on its property: 155 . Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
Consents on record by month
The last three years. A recent dip is often records still to arrive.
155 consents
- Commercial alterations
Storage Shed/Workshop
- Commercial alterations
Four Attached Motel Units
- Commercial alterations
Boatshed/Workshop
- Commercial alterations
STAGE 1 - Remedial Work to Reinstate Fire Damaged Areas - Foundation and Floor Slab
- Commercial alterations
STAGE 2 - Framing, Roofing and Exterior Cladding to Closed in Stage, and Drainlaying
- New commercial buildings
Up-Grade Main Motel Building and Septic Systems
- New commercial buildings
Install Two Tempering Valves
- Commercial alterations
Upgrade of Toilet Block - New Toilets, Septic Tank and Disposal Field
- New commercial buildings
Two Cabins
- Farm buildings
Implement Shed Addition - Shower, Toilet and Chip Heater
- Farm buildings
Re-Build Hay/Implement Shed
- New commercial buildings
STAGE 3 - Completion of Lodge Re-Building
- New commercial buildings
Demolish Existing Dwelling, Construct Seven Holiday Units and Dwelling
- Commercial alterations
Alteration to Dwelling to Form a House Bar
- Commercial alterations
Alterations to Units
- Farm buildings
Greenhouse
- Farm buildings
Boat and Implement Shed
- Commercial alterations
Refurbishment of Existing Hotel
- Relocated buildings
Relocate Bunk Room within Existing Site
- New commercial buildings
Alter Existing Bunkhouse Building for Staff Accommodation
- Farm buildings
Covered Yards and Extension to Existing Woolshed
- Commercial alterations
Stage 2 - Extend Staff Accommodation
- Commercial alterations
Replace Existing Lodge with New Facilities
- Farm buildings
Implement Shed
- Farm buildings
Implement Shed and Workshop/Storage
ResidentialCommercial The dots are this page of the list.
Suburbs in Marlborough Sounds
Where the consents we hold are, most in the last 12 months first.
- Furneaux0 / 14
- Rangitoto ki te Tonga / D'Urville Island0 / 11
- Lochmara Bay0 / 10
- Portage0 / 10
- Punga Cove0 / 10
- Arapaoa Island0 / 9
- Raetihi0 / 8
- Squally Cove0 / 6
- Ōnahau Bay0 / 6
- Tennyson Inlet0 / 5
- Mahau Sound0 / 5
- French Pass / Anaru0 / 5
- Admiralty Bay0 / 4
- Bay Of Many Coves0 / 4
- North West Bay0 / 4
- Nōpera0 / 3
- Tamuri0 / 3
- Te Māhia0 / 3
- Crail Bay0 / 3
- Waitātā0 / 2
- Duncan Bay0 / 2
- Port Ligar0 / 2
- Double Cove0 / 2
- Cissy Bay0 / 2
- Ruakākā Bay0 / 2
- Saint Omer0 / 2
- Bulwer0 / 2
- South East Bay0 / 2
- Anakoha0 / 2
- Manaroa0 / 2
- Waitaria Bay0 / 2
- Kenepuru Head0 / 1
- Endeavour Inlet0 / 1
- Nydia Bay0 / 1
- Ōhauparuparu Bay0 / 1
- Elaine Bay0 / 1
- The Pines0 / 1
- Titirangi0 / 1
- Goulter Bay0 / 1
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.