Building consents
Building consents in Raetihi
Below: 50 consents we hold in Raetihi, searchable and on the map.
Consents on record in Raetihi
Individual building consents we hold, each on its property: 50 from 1 Jun 2024 to 1 Jun 2024. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating1
typically $5,265
Consents on record by month
The last three years. A recent dip is often records still to arrive.
50 consents
- Fires and heating$5,265
Free standing Metro Wee Rad Leg solid fuel heater
- Alterations and additions
Install Two Free Standing Milan Caldo Log Fires
- Demolition
Partial Demolition of Fire Damaged Building
- Commercial alterations
STAGE 1 - Remedial Work to Reinstate Fire Damaged Areas - Foundation and Floor Slab
- Commercial alterations
STAGE 2 - Framing, Roofing and Exterior Cladding to Closed in Stage, and Drainlaying
- New commercial buildings
STAGE 3 - Completion of Lodge Re-Building
- Alterations and additions
Alterations and Additions
- Alterations and additions
Amendment to BC010854
- Plumbing, drainage and wastewater
Upgrade Septic Tank System
- New homes
Dwelling
- Other new buildings
Alteration and Addition
- Alterations and additions
Addition
- New homes
Dwelling With Log Fire
- Commercial alterations
Additions
- Fires and heating
Free Standing Logaire Minos Log Fire
- Alterations and additions
Alterations & Installation Of Gourmet Cooker
- Alterations and additions
Demolish Existing Guest Wing/Kitchen/Bathrooms/Laundry & Building New Extensions To Rear Of Dwelling & New Log Fire
- New homes
Dwelling With Free Standing Metro Eco Wee Rad Logfire & Detached Carport
- Garages, sheds and carports
New Proprietary Site Shed
- Garages, sheds and carports
Shed & Erect New Carport
- Fires and heating
Amendment to BC062315 - Change Balustrade System / Wood burner
- Plumbing, drainage and wastewater
Drainage Work/Wastewater Treatment System
- Alterations and additions
Additions
- Plumbing, drainage and wastewater
Replacement On-Site Wastewater Management System
- New homes
Dwelling With Detached Garage
ResidentialCommercial The dots are this page of the list.
Near Raetihi
- Mahau Sound
- Portage
- Ōnahau Bay
- Arapaoa Island
- Te Māhia
- Lochmara Bay
- Tennyson Inlet
- Bay Of Many Coves
- Double Cove
- North West Bay
- Ruakākā Bay
- Duncan Bay
- Blackwood Bay
- Rangitoto ki te Tonga / D'Urville Island
- French Pass / Anaru
- Saint Omer
- Waitaria Bay
- Squally Cove
- Cissy Bay
- Elaine Bay
- Punga Cove
- Crail Bay
- Admiralty Bay
- The Pines
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.