Building consents
Commercial building consents in Matamata
Below: 9 commercial consents we hold in Matamata, searchable and on the map.
Commercial consents on record in Matamata
Individual building consents we hold, each on its property: 9 from 1 Feb 2021 to 1 Dec 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations7
typically $45k
- New commercial buildings1
1 in the last 12 months · typically $3.4m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $3.4mCommercial - construction of 6 x single level res duplexes (12 x units total). 20 Pohutukawa Place, Matamata
9 consents
- New commercial buildings$3.4m
Commercial - construction of 6 x single level res duplexes (12 x units total).
- Commercial alterations$260k
Extension to existing workshop
- Commercial alterations$200k
rbw add at one end of the house of two bedrooms & an ensuite, the other end an entrance, office & extra living space.
- Commercial alterations$60k
Locate a new transportable home & connect to foundations & services. New building covered by a ccc by Waipa District dc. This will be issued to Matamata piako dc upon completion of the building in the factory
- Commercial alterations$30k
Erect gge/workshop
- Commercial alterations$1
C1 - notification of change of use - converting office building to single unit res building.
- Commercial alterations$7,000
To fit a new Eco Xtreme Rad leg woodfire in workshop
- Commercial alterations$45k
Dbl gge & workshop
- Commercial alterations$130k
Lounge/bdrm extension convert ensuite back into office
ResidentialCommercial The dots are this page of the list.
Suburbs in Matamata
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.