Building consents
Building consents in Matatā
Below: 76 consents we hold in Matatā, searchable and on the map.
Consents on record in Matatā
Individual building consents we hold, each on its property: 76 from 1 Sep 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating16
2 in the last 12 months · typically $5,000
- New homes16
1 in the last 12 months · typically $283k
- Alterations and additions12
4 in the last 12 months · typically $21k
- Pools and spas5
1 in the last 12 months · typically $60k
- Relocated buildings4
1 in the last 12 months · typically $138k
- Garages, sheds and carports4
typically $52k
- New commercial buildings2
1 in the last 12 months · typically $1.9m
- Repairs, recladding and strengthening1
typically $213k
- Plumbing, drainage and wastewater1
typically $10k
- Decks, pergolas and verandahs1
typically $23k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2mRbw: construction of new single storey house with two wings. New gge shed. Total of four bedrooms, four bathrroms, media room, office, kitchen, dbl gge, pool & solid fuel heater. Retaining 2 Kereru Lane, Matatā
- $750kNew 3 bdrm dwg 86D Mimiha Ridge Road, Matatā
- $150kInstallation of fibreglass swimming pool + landscaping 39 Smith Road, Matatā
- $150kRelocate a 3 bdrm & 2 bathrm lockwood dwg. , Matatā
- $99kRenovation to transportable house for trident high school fund raiser 84 Arawa Street, Matatā
76 consents
- Relocated buildings$150k
Relocate a 3 bdrm & 2 bathrm lockwood dwg.
- Alterations and additions$4,000
Fire install
- New homes$750k
New 3 bdrm dwg
- Alterations and additions$99k
Renovation to transportable house for trident high school fund raiser
- Fires and heating$3,000
Install a solid wood burner
- Alterations and additions$4,000
New fire install
- Fires and heating$2,000
Removal of existing wood fire & replacing with new metro xtreme rad with legs in current location.
- Alterations and additions$50k
Internal alterations - new mezzanine & bathrm reconfiguration
- Pools and spas$150k
Installation of fibreglass swimming pool + landscaping
- New commercial buildings$2m
Rbw: construction of new single storey house with two wings. New gge shed. Total of four bedrooms, four bathrroms, media room, office, kitchen, dbl gge, pool & solid fuel heater. Retaining
- Decks, pergolas and verandahs$23k
New joinery to family room & pergola extension
- New homes$125k
New 1 bdrm dwg
- Fires and heating$5,000
Install masport Kaituna freestanding fire
- Alterations and additions$20k
Replacing existing acrylic shower tray type showers with tiled showers & new tiled walls & floors.
- Fires and heating$6,000
Solid fuel fire replaced with new
- Pools and spas$60k
Installation of fibreglass in-ground swimming pool & pool fencing.
- New homes$300k
Construct 3 bdrm home on site (temporary- to be relocated to waveley on completion)
- Garages, sheds and carports$73k
Construct a 10.2m x 6.6m gge
- New homes$250k
A proposed 3-bdrm dwg with multiple cladding types only to be built on temporary site before relocation. No proposed drainage due to temporary nature of structure. Foundation to be built o
- Fires and heating$5,500
Install masport Kaituna freestanding fire
- Alterations and additions$18k
Res/farm - shower wall & floor to be tiled.
- New homes$400k
New single storey dwg, 3 bedrooms, 2 bathrooms & attached gge.
- New homes$485k
New 3 bdrm dwg
- Fires and heating$3,000
Replacing existing solid wood burner
- Alterations and additions$4,000
S.F.H installation consent
ResidentialCommercial The dots are this page of the list.
Suburbs in Matatā
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.