Building consents

Residential building consents in Meremere

Below: 23 residential consents we hold in Meremere, searchable and on the map.

Consents we hold237 in the last 12 monthsSearch them ↓

Residential consents on record in Meremere

Individual building consents we hold, each on its property: 23 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating6

    1 in the last 12 months · typically $5,000

  2. New homes3

    2 in the last 12 months · typically $511k

  3. Plumbing, drainage and wastewater3

    2 in the last 12 months · typically $45k

  4. Alterations and additions3

    1 in the last 12 months · typically $20k

  5. Retaining walls1

    1 in the last 12 months · typically $10k

  6. Garages, sheds and carports1

    typically $80k

  7. Relocated buildings1

    typically $90k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01122202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 1March 2024: 0April 2024: 0May 2024: 0June 2024: 0July 2024: 0August 2024: 0September 2024: 1October 2024: 0November 2024: 0December 2024: 0January 2025: 1February 2025: 0March 2025: 0April 2025: 1May 2025: 2June 2025: 0July 2025: 1August 2025: 1September 2025: 1October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 2March 2026: 1April 2026: 2May 2026: 0June 2026: 2July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $795kDwg 473 Springhill Road
  2. $411kDwg with attached gge 40 Te Puea Avenue
  3. $105kTransportable dwg (siting) 6 Heather Green Avenue
  4. $105kSiting, pile foundations, drainage, onsite stormwater system for a transportable dwg 8 Heather Green Avenue
  5. $30kNew wastewater disposal system to replace existing system onsite. 85 Te Puea Avenue

23 consents

  1. New homes$411k

    Dwg with attached gge

    40 Te Puea Avenue · 1 Jun 2026 · BLD0329/26

  2. Plumbing, drainage and wastewater$105k

    Siting, pile foundations, drainage, onsite stormwater system for a transportable dwg

    8 Heather Green Avenue · 1 Jun 2026 · BLD0702/26

  3. Plumbing, drainage and wastewater$30k

    New wastewater disposal system to replace existing system onsite.

    85 Te Puea Avenue · 1 Apr 2026 · BC26-012718

  4. Alterations and additions$105k

    Transportable dwg (siting)

    6 Heather Green Avenue · 1 Apr 2026 · BLD0446/26

  5. New homes$795k

    Dwg

    473 Springhill Road · 1 Mar 2026 · BLD0600/26

  6. Fires and heating$4,500

    Fire installation - freestanding woodsman Brunner mkii wood burner

    6 Tainui Street · 1 Feb 2026 · 002116422026

  7. Retaining walls$10k

    Retaining wall

    22 Heather Green Avenue · 1 Feb 2026 · BLD0616/26

  8. Fires and heating$6,000

    Replace fire with Ltd metro wee rad leg

    92 Te Puea Avenue · 1 Sep 2025 · BC25-012169

  9. Plumbing, drainage and wastewater$45k

    Foundations, storm water soakage, & associated connections for a re-sited dwg.

    21 Te Puea Avenue · 1 Aug 2025 · BLD1213/25

  10. Fires and heating$4,500

    Heater

    29 Heather Green Avenue · 1 Jul 2025 · BLD0009/26

  11. Fires and heating$5,000

    Inbuilt/wetback - metro trend insert with thermo fan wood fire

    5 Tainui Street · 1 May 2025 · BC25/133781

  12. Garages, sheds and carports$80k

    Gge

    22 Heather Green Avenue · 1 May 2025 · BLD0927/25

  13. Fires and heating$7,000

    New installation of maxen kinmont 350p fire & flue

    2 Tainui Street · 1 Apr 2025 · BC250098

  14. Relocated buildings$90k

    Foundations & associated connections for a re-site dwg

    38 Kohekohe Crescent · 1 Jan 2025 · BLD0569/25

  15. Fires and heating$5,000

    Masport Kaituna freestanding fire

    6 Herewini Street · 1 Sep 2024 · BC24-011146

  16. Alterations and additions$20k

    Rbw - reinstall an existing bathrm. Replace the existing shower, toilet, & basin.

    19 Kohekohe Crescent · 1 Feb 2024 · BCO10377844

  17. New homes$511k

    Two storey dwg with attached gge

    10 Herewini Street · 1 Oct 2023 · BLD1043/23

  18. Alterations and additions$15k

    Internal alterations. Removing wall between lounge & detached dwg

    6 Tainui Street · 1 Sep 2022 · 22/0764

  19. Relocated buildings$80k

    Relocated 2nd hand dwg on new foundations. New soak hole for sw collection & connect sewer to council site connection

    1 Herewini Street · 1 Sep 2021 · BLD0249/22

  20. Fires and heating$3,605

    Install freestanding of metro tiny ped solid fuel heater

    1 Tainui Street · 1 Apr 2021 · 310798

  21. Fires and heating$4,759

    Heater

    22 Kohekohe Crescent · 1 May 2020 · BLD1694/20

  22. Alterations and additions$14k

    Renovate bathrm

    15 Emere Place · 1 Nov 2019 · BLD0669/20

  23. Fires and heating$3,747

    Heater

    27 Heather Green Avenue · 1 Aug 2019 · BLD0220/20

ResidentialCommercial The dots are this page of the list.

Near Meremere

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.