Building consents
Commercial building consents in Morrinsville
Below: 6 commercial consents we hold in Morrinsville, searchable and on the map.
Commercial consents on record in Morrinsville
Individual building consents we hold, each on its property: 6 from 1 Feb 2022 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations4
typically $100k
- New commercial buildings2
1 in the last 12 months · typically $1m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $898kNew single level res home, 4 bedrooms, 1 office, 2 bathrooms, dbl gge, rib raft floor, brick & axon cladding, metal profile roof amendment 1: revised kitchen layout & sink added to scullery 130 Marsh Avenue, Morrinsville
6 consents
- New commercial buildings$898k
New single level res home, 4 bedrooms, 1 office, 2 bathrooms, dbl gge, rib raft floor, brick & axon cladding, metal profile roof amendment 1: revised kitchen layout & sink added to scullery
- New commercial buildings$1.2m
Proposed new 4 bdrm dwg with 2 living, rumpus, office & internal access gge
- Commercial alterations$100k
Alt to dwg: extension to dining area & deck. Add of ensuite, laundry, office, & detached gge
- Commercial alterations$99k
Res/farm-change of use of the existing storage & carport to accommodate a proposed living area & scullery. Additionally the existing storage/carport area will be extended to provide a new storage room & a proposed office. Existing kitc
- Commercial alterations$375k
Additions to dwg. Ground floor add with new laundry, wc dbl gge/workshop. Existing gge area converted to office, entry. Relocating existing stairs. Rib-raft floor, plastered bric
- Commercial alterations$40k
Detached gge plus workshop . Totalspan kitset
ResidentialCommercial The dots are this page of the list.
Suburbs in Morrinsville
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.