Building consents
Commercial building consents in Muriwai
Below: 4 commercial consents we hold in Muriwai, searchable and on the map.
Commercial consents on record in Muriwai
Individual building consents we hold, each on its property: 4 from 1 Feb 2025 to 1 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations3
1 in the last 12 months · typically $90k
- New commercial buildings1
typically $400k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $330kRbw - construct shed with home office, gym & bathrm on pre-existing site. On site wastewater disposal system 20 Constable Road, Muriwai Beach
4 consents
- Commercial alterations$330k
Rbw - construct shed with home office, gym & bathrm on pre-existing site. On site wastewater disposal system
- New commercial buildings$400k
Rbw - new mdu incl one bed, bath, open kitchen /living dining area, firebox. Detached gge with workshop area & laundry. Covered deck/s with outdoor fireplace. New tprw to support gravel driveway. D
- Commercial alterations$40k
Rbw - new bathrm with shower, vanity & wc to existing first floor workshop storage room, with new wastewater drains & grinder pump .
- Commercial alterations$90k
Rbw - brand new factory-built dwg to be delivered to site where foundations, construction of decks, install of new onsite wastewater system, connection to services & drainage will be carried ou
ResidentialCommercial The dots are this page of the list.
Suburbs in Muriwai
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.