Building consents

Residential building consents in Marewa

Below: 203 residential consents we hold in Marewa, searchable and on the map.

Consents we hold20318 in the last 12 monthsSearch them ↓

Residential consents on record in Marewa

Individual building consents we hold, each on its property: 203 from 1 Aug 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating47

    3 in the last 12 months · typically $5,062

  2. Alterations and additions31

    8 in the last 12 months · typically $30k

  3. New homes26

    1 in the last 12 months · typically $405k

  4. Garages, sheds and carports6

    1 in the last 12 months · typically $28k

  5. Plumbing, drainage and wastewater5

    2 in the last 12 months · typically $9,000

  6. Minor dwellings and sleepouts5

    typically $150k

  7. Repairs, recladding and strengthening4

    typically $23k

  8. Relocated buildings2

    1 in the last 12 months · typically $313k

  9. Multiple homes2

    1 in the last 12 months · typically $1.5m

  10. Pools and spas1

    1 in the last 12 months · typically $6,000

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0246202420252026November 2023: 3December 2023: 0January 2024: 3February 2024: 2March 2024: 1April 2024: 3May 2024: 4June 2024: 2July 2024: 4August 2024: 3September 2024: 1October 2024: 0November 2024: 4December 2024: 0January 2025: 1February 2025: 3March 2025: 2April 2025: 3May 2025: 2June 2025: 3July 2025: 2August 2025: 3September 2025: 1October 2025: 2November 2025: 2December 2025: 0January 2026: 1February 2026: 1March 2026: 1April 2026: 1May 2026: 5June 2026: 3July 2026: 4August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $1.1mStage 2 of 2 - construct two x two storey apartments containing four 1 x bdrm units each 80 Douglas McLean Avenue
  2. $600kResite existing dwg, new 2 x bdrm duplex 55 Barker Road
  3. $455kNew 3 x bdrm dwg with gge 35A Nuffield Avenue
  4. $300kRe-instate fire damaged roof + internal layout changes 116 Latham Street
  5. $200kAdd to dwg 47 Sanders Avenue

203 consents

  1. Alterations and additions$13k

    260540 - lot 2 - install firenzo kompac with serenity fascia into zero clearance cavity

    46 Williams Street · 1 Jul 2026 · BC/0488/26

  2. Plumbing, drainage and wastewater$5,000

    Install new stormwater drainage connecting existing downpipes to new kerb & channel connection

    64 Logan Avenue · 1 Jul 2026 · BC260359

  3. Fires and heating$6,000

    New install of metro wee curve freestanding woodburner in lounge

    57 Barker Road · 1 Jul 2026 · BC260378

  4. Fires and heating$5,500

    New install of metro r1 freestanding woodburner on tiled wall floor protector

    5 Morgan Avenue · 1 Jul 2026 · BC260379

  5. Alterations and additions$5,000

    Add 2 beams & change to level entry shower

    47 Sanders Avenue · 1 Jun 2026 · BC250609.A1

  6. Alterations and additions$10

    Foundations & services for house me unit

    178 Kennedy Road · 1 Jun 2026 · BC260169

  7. Alterations and additions$500

    Create door in loadbearing wall

    77 Barker Road · 1 Jun 2026 · BC260302

  8. Relocated buildings$600k

    Resite existing dwg, new 2 x bdrm duplex

    55 Barker Road · 1 May 2026 · BC250521

  9. Multiple homes$1.1m

    Stage 2 of 2 - construct two x two storey apartments containing four 1 x bdrm units each

    80 Douglas McLean Avenue · 1 May 2026 · BC260099

  10. Garages, sheds and carports$65k

    New dbl gge

    29 Sanders Avenue · 1 May 2026 · BC260144

  11. Plumbing, drainage and wastewater$15k

    Unit a renovation comprising a new ensuite bathrm with vanity, toilet, & tray liner shower.

    25 Morgan Avenue · 1 May 2026 · BCO10410485

  12. Alterations and additions$2,000

    Two small walls in kitchen area removed, new beams installed

    14 Veronica Avenue · 1 May 2026 · CA260153

  13. Alterations and additions$300k

    Re-instate fire damaged roof + internal layout changes

    116 Latham Street · 1 Apr 2026 · BC260118

  14. Pools and spas$6,000

    Pool fence & pool gate

    15 Sanders Avenue · 1 Mar 2026 · BC204036

  15. Alterations and additions$180k

    Add to dwg of living area & bdrm

    37 Sanders Avenue · 1 Feb 2026 · BC250659

  16. Alterations and additions$200k

    Add to dwg

    47 Sanders Avenue · 1 Jan 2026 · BC250609

  17. New homes$455k

    New 3 x bdrm dwg with gge

    35A Nuffield Avenue · 1 Nov 2025 · BC250258

  18. Fires and heating$7,000

    Replace existing with firenzo kompact ag insert woodburner

    41 Higgins Street · 1 Nov 2025 · BC250620

  19. Repairs, recladding and strengthening$12k

    Reclad of exterior

    3/49 Sanders Avenue · 1 Oct 2025 · BC250379

  20. Fires and heating$5,348

    Replace existing with masport Rangitata insert woodburner

    20 Logan Avenue · 1 Oct 2025 · BC250555

  21. New homes$445k

    Multi-unit dwg - 1 x 3 bdrm dwg with attached single gge & 1 x 2 bdrm domestic dwg

    31 Higgins Street · 1 Sep 2025 · BCI2500007

  22. Alterations and additions$50k

    Internal alterations to dwg

    5 Douglas McLean Avenue · 1 Aug 2025 · BC250358

  23. Fires and heating$5,000

    New install of metro tiny rad base freestanding woodburner

    29A Seddon Crescent · 1 Aug 2025 · BC250421

  24. Fires and heating$5,062

    Replace existing with metro rad one freestanding woodburner

    51 Nuffield Avenue · 1 Aug 2025 · BC250460

  25. Fires and heating$3,000

    250487 - lot 34 - wood fire place replacement

    44 Williams Street · 1 Jul 2025 · BC/0477/25

ResidentialCommercial The dots are this page of the list.

Near Marewa

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Napier City Council.