Building consents
Building consents in Rissington
Below: 9 consents we hold in Rissington, searchable and on the map.
Consents on record in Rissington
Individual building consents we hold, each on its property: 9 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating4
2 in the last 12 months · typically $6,500
- Plumbing, drainage and wastewater2
2 in the last 12 months · typically $18k
- Alterations and additions1
typically $15k
- New homes1
typically $280k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $26kReplacement septic system & effluent disposal field 2794 Puketitiri Road
- $9,000Replace failed effluent disposal field 2396 Puketitiri Road
- $7,300To install a metro xtreme rad base Ltd freestanding fire in lounge 2127 Puketitiri Road
- $7,000Install a solid fuel heater into the lounge 2117 Puketitiri Road
9 consents
- Fires and heating$7,300
To install a metro xtreme rad base Ltd freestanding fire in lounge
- Plumbing, drainage and wastewater$26k
Replacement septic system & effluent disposal field
- Fires and heating$7,000
Install a solid fuel heater into the lounge
- Plumbing, drainage and wastewater$9,000
Replace failed effluent disposal field
- Fires and heating$5,000
Install new masport Hurunui & flue kit
- Alterations and additions$15k
Wall removal, new fire
- Fires and heating$6,000
New installation of freestanding sfh - firenzo Bronte with leg base
- New homes$280k
New dwg
- Retaining walls$45k
New retaining wall
ResidentialCommercial The dots are this page of the list.
Near Rissington
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.