Building consents
Residential building consents in Washington Valley
Below: 12 residential consents we hold in Washington Valley, searchable and on the map.
Residential consents on record in Washington Valley
Individual building consents we hold, each on its property: 12 from 1 Aug 2019 to 1 Oct 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions4
typically $21k
- Decks, pergolas and verandahs1
typically $35k
- Fires and heating1
typically $7,000
- Minor dwellings and sleepouts1
typically $238k
- Retaining walls1
typically $50k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
12 consents
- Decks, pergolas and verandahs$35k
New deck & sliding door
- Fires and heating$7,000
Milan harmony insert fire
- Alterations and additions$450k
Rbw - additions to existing house including bdrm & ensuite bathrm. New louvre roof, retaining walls & exterior landscaping.
- Alterations and additions$22k
Replace walls with beam & install wet floor shower
- Retaining walls$50k
Retaining wall
- Alterations and additions$20k
Bathrm alt
- Minor dwellings and sleepouts$238k
Fraemohs sleepout
- Alterations and additions$18k
Bathrm alt
- Alterations and additions$50k
Reinstate fire damaged kitchen
- Fires and heating$5,000
Install metro wee rad fire
- Alterations and additions$3,500
Install magnum p100 fire
- Alterations and additions$6,800
Install ravelli rosa r70 pelle
ResidentialCommercial The dots are this page of the list.
Near Washington Valley
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.