Building consents
Building consents in Paraite
Below: 50 consents we hold in Paraite, searchable and on the map.
Consents on record in Paraite
Individual building consents we hold, each on its property: 50 from 1 Aug 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating15
4 in the last 12 months · typically $5,000
- Alterations and additions5
1 in the last 12 months · typically $75k
- New homes4
1 in the last 12 months · typically $760k
- Pools and spas3
typically $100k
- Plumbing, drainage and wastewater3
typically $15k
- Garages, sheds and carports2
2 in the last 12 months · typically $110k
- Commercial alterations2
1 in the last 12 months · typically $124k
- Minor dwellings and sleepouts2
typically $126k
- Decks, pergolas and verandahs2
typically $94k
- Multiple homes1
typically $733k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $570kThree bdrm residence with attached dbl gge 190 Corbett Road
- $242kRevised internal layout of bathrm / laundry & add off existing master bdrm. new extension out to north adding new kitchen & dining area opening out onto extended deck. New mudroom added & stair access to office in roof space. 315 Paraite Road
- $140kConstruct a 240m2 gge 302 Corbett Road
- $80kNew 120m2 steel framed shed. 9 Ninia Road
- $25kDwg alt including kitchen. 246 Paraite Road
50 consents
- Garages, sheds and carports$80k
New 120m2 steel framed shed.
- Fires and heating$5,000
Installation of a metro xtreme rad Ltd leg
- Garages, sheds and carports$140k
Construct a 240m2 gge
- Fires and heating$6,500
Install masport Rangitata insert woodfire
- Fires and heating$6,000
New solid fuel burner & connection to an exsisiting wetback system to be installed. Wood burner to be installed is a metro xtreme rad leg model.
- Fires and heating$5,000
Install of a metro Ltd smart insert woodfire
- Commercial alterations$242k
Revised internal layout of bathrm / laundry & add off existing master bdrm. new extension out to north adding new kitchen & dining area opening out onto extended deck. New mudroom added & stair access to office in roof space.
- Alterations and additions$25k
Dwg alt including kitchen.
- New homes$570k
Three bdrm residence with attached dbl gge
- Minor dwellings and sleepouts$162k
Res/farm - one bdrm, with ensuite & hobbies room sleepout
- Decks, pergolas and verandahs$38k
Res/farm - conservatory to existing deck
- Fires and heating$5,500
Freestanding - metro micro rad free standing wood burner
- Multiple homes$733k
Rbw - 2 x two-storey semi-detached dwgs, each dwg has 3 bedrooms, 2.5 bathrooms, kitchen dining living, laundry, one external carpark & one underground stormwater tank.
- Fires and heating$2,000
Freestanding - install masport Kaituna ped free standing wood burner
- Alterations and additions$75k
Res/farm - alterations to dwg
- Alterations and additions$75k
Res/farm - extension of living/dining area
- Fires and heating$5,000
Freestanding - install masport r5000 base free standing wood burner
- Alterations and additions$80k
Res/farm - dwg alterations & additions
- Fires and heating$5,000
Inbuilt/wetback - masport insert wood burner
- Pools and spas$100k
Res/farm - new pool & fencing
- New homes$950k
Res/farm - four bdrm dwg with attached dbl gge (SOL)
- Alterations and additions$300k
Res/farm - external & internal alterations to dwg
- Minor dwellings and sleepouts$90k
Res/farm - proposed two bdrm cabin on existing res property (sol)
- Commercial alterations$6,000
Internal dwg alterations - change to swap bathrm & adjacent office
- New homes$1.2m
Res/farm - three bdrm dwg with attached dbl gge (gge to have green roof (sol)
ResidentialCommercial The dots are this page of the list.
Near Paraite
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.