Building consents
Building consents in Pitone
Below: 10 consents we hold in Pitone, searchable and on the map.
Consents on record in Pitone
Individual building consents we hold, each on its property: 10 from 1 Oct 2019 to 1 Feb 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions2
2 in the last 12 months · typically $108k
- Plumbing, drainage and wastewater1
typically $20k
- Fires and heating1
typically $1,200
- Relocated buildings1
typically $32k
- Retaining walls1
typically $42k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $200kExisting single room house to be extended into three bdrm dwg 749 Upper Pitone Road
- $15kConvert existing bathrm to an ensuite including installation of a new toilet on the east wall & tiled shower on north wall. 304 Upper Pitone Road
10 consents
- Alterations and additions$15k
Convert existing bathrm to an ensuite including installation of a new toilet on the east wall & tiled shower on north wall.
- Alterations and additions$200k
Existing single room house to be extended into three bdrm dwg
- Plumbing, drainage and wastewater$20k
Res/farm - new wastewater design
- Relocated buildings$32k
Res/farm - relocate two bdrm dwg
- Retaining walls$42k
Res/farm- retaining wall- (p)
- Fires and heating$1,200
Freestanding - metro Ltd mega rad woodburner
- Alterations and additions$10k
Res/farm - shower add & bathrm alterations (p)
- Fires and heating$3,800
Freestanding - jayline fr300 free standing wood fire installation
- Garages, sheds and carports$65k
Other res/farm- adding storage shed & gge to existing gge
- Decks, pergolas and verandahs$20k
Other res/farm - extension to dwg & add of a veranda to existing house
ResidentialCommercial The dots are this page of the list.
Near Pitone
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.