Building consents
Building consents in Ngatea
Below: 167 consents we hold in Ngatea, searchable and on the map.
Consents on record in Ngatea
Individual building consents we hold, each on its property: 167 from 1 Jul 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating27
10 in the last 12 months · typically $6,000
- Alterations and additions26
4 in the last 12 months · typically $28k
- New homes21
7 in the last 12 months · typically $562k
- Relocated buildings14
3 in the last 12 months · typically $85k
- Garages, sheds and carports12
1 in the last 12 months · typically $65k
- Pools and spas4
2 in the last 12 months · typically $74k
- Minor dwellings and sleepouts3
1 in the last 12 months · typically $235k
- Multiple homes2
2 in the last 12 months · typically $616k
- Commercial alterations2
1 in the last 12 months · typically $177k
- Insulation2
typically $4,300
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2m10 one & two bdrm dwg units including combined dwg 9 Matai Street, Turua
- $883kDuplex dwg (1 masons way) , Ngatea
- $700kConstruction of new dwg 11 Spring Road, Mangatarata
- $670kConstrution of new dwg 9 McWatters Drive, Ngatea
- $450kConstruction of new dwg 128 Ohinewai Road, Kaihere
167 consents
- Commercial alterations$289k
New shed with workshop & sewing room
- New homes$670k
Constrution of new dwg
- Relocated buildings$112k
Relocated dwg - foundations & site works
- Relocated buildings$90k
Relocated dwg - foundations & site works
- Fires and heating$7,000
Solid fuel heater - kent Ruapehu clean air
- Fires and heating$9,000
Solid fuel heater - metro xtreme rad base
- Fires and heating$6,000
Solid fuel heater - metro Ltd wee rad base
- Fires and heating$6,000
Solid fuel heater - metro Ltd wee rad base
- Fires and heating$8,500
Solid fuel heater - nectar bakers oven woodburner
- Fires and heating$6,000
Install a new maxen Henley 250 woodfire
- New homes$200k
Two bdrm dwg - unit 1
- New homes$200k
Two bdrm dwg - unit 2
- Multiple homes$350k
Two x 2 bdrm units connected - units 3 & 4
- Fires and heating$7,000
Solid fuel heater - metro smart insert replacing existing fire
- Minor dwellings and sleepouts$409k
Minor unit with attached gge, wood fire
- Repairs, recladding and strengthening$80k
Raise finished floor level of dwg, remedial work to foundations & sub-floor
- Relocated buildings$45k
Relocated dwg - foundation & site works
- Fires and heating$6,000
Solid fuel heater - metro smart insert woodfire
- Fires and heating$8,200
Install inbuilt metro smart solid fuel burner (replacement)
- New homes$2m
10 one & two bdrm dwg units including combined dwg
- Fires and heating$6,000
Free standing maxen Henley 250 solid fuel heater
- Alterations and additions$190k
Add to dwg
- Garages, sheds and carports$50k
Replace existing foundations & gge floor
- Alterations and additions$9,000
Refit of ensuite to include a tiled shower, on the floor & detached dwgs
- Multiple homes$883k
Duplex dwg (1 masons way)
ResidentialCommercial The dots are this page of the list.
Suburbs in Ngatea
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.