Building consents
Building consents in Windsor
Below: 9 consents we hold in Windsor, searchable and on the map.
Consents on record in Windsor
Individual building consents we hold, each on its property: 9 from 1 Aug 2019 to 1 Jan 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating2
typically $5,000
- Alterations and additions1
1 in the last 12 months · typically $25k
- New commercial buildings1
1 in the last 12 months · typically $100k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $100kConstruction of a 1 bdrm cottage with office 4 Railway Street
- $25kAdd ensuite & sink to existing sleep-out 129 Windsor Road
9 consents
- Alterations and additions$25k
Add ensuite & sink to existing sleep-out
- New commercial buildings$100k
Construction of a 1 bdrm cottage with office
- Fires and heating$5,000
Alt to dwg - installation of woodsman serene, freestanding, dry, woodburner, cac 194586
- Fires and heating$5,000
Installation of a freestanding woodsman Tarras mkiii woodburner
- Alterations and additions$150k
Add & alterations to dwg. Enclosure of patio to make ensuite
- Fires and heating$5,000
Installation of a free-standing woodsman Tarras mk iii woodburner &
- New homes$340k
Construction of a new 3 bdrm dwg with woodsman Tarras mk iii
- Fires and heating$4,438
Install of replacement sfh - metro eco smart insert fire
- Plumbing, drainage and wastewater$5,000
Amendment 2019/6249/2 installation of a toilet, hand basin & shower
ResidentialCommercial The dots are this page of the list.
Near Windsor
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.