Building consents
Residential building consents in Ohai
Below: 42 residential consents we hold in Ohai, searchable and on the map.
Residential consents on record in Ohai
Individual building consents we hold, each on its property: 42 from 1 Apr 2020 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating15
typically $6,000
- Alterations and additions8
typically $10k
- New homes3
1 in the last 12 months · typically $621k
- Garages, sheds and carports2
1 in the last 12 months · typically $68k
- Minor dwellings and sleepouts2
typically $58k
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $60k
- Repairs, recladding and strengthening1
typically $35k
- Retaining walls1
typically $5,000
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.5mDwg with attached gge 47 Birchwood Road, Ohai
- $85kExtend & alt internal layout of dwg, demolish gge, construct deck 24 Kirkland Street, Ohai
- $60kHome relocation & drainage 74 Hastings Street, Ohai
42 consents
- Garages, sheds and carports$85k
Extend & alt internal layout of dwg, demolish gge, construct deck
- Plumbing, drainage and wastewater$60k
Home relocation & drainage
- New homes$2.5m
Dwg with attached gge
- Fires and heating$10k
Installation of a yunca monte base c/a sub 1.0
- Fires and heating$7,500
Install masport Kaituna woodburner
- Fires and heating$3,000
Install freestanding kent Oxford woodburner
- Fires and heating$3,500
Install escea kinmont 450 heater in dwg
- New homes$75k
New construction of a shed that will be a res dwg. Plans & specifications included for the shed to comply as a level 1 building & is suitable as dwg
- Garages, sheds and carports$50k
Build a dbl gge - great southern group
- Minor dwellings and sleepouts$90k
10.0m x 7.0 gge/sleepout with bathrm facilities outbuilding
- Fires and heating$5,000
Installation of solid fuel heater - wagener sparky
- Fires and heating$5,000
Installation of woodsman rmf multi-fuel onto 30mm insulated hearth corner install
- Alterations and additions$150k
R3 - alt to existing semi-detached dwg - internal alterations, relocate kitchen, bathrm laundry, replace windows & doors, insulate walls, floor, & ceiling.
- Retaining walls$5,000
New retaining walls & private drainage.
- Minor dwellings and sleepouts$25k
Rbw add alt proposed conversion of standalone gge & sleepout to minor dwg by adding a kitchen in the gge hence reducing the gge space. Adding a firewall between the gge & dwg
- Fires and heating$6,600
Installation of a woodsman Tarras mkiii wet back
- Alterations and additions$500
Coa - personal shower
- New homes$621k
New dwg with attached gge
- Fires and heating$3,800
Re-install existing woodsman strongman with new flue kit & roof flashings
- Fires and heating$7,000
Install champion tria pellet fire in dwg
- Alterations and additions$30k
Housing - remove chimney & in space put walking wardrobe & ensuite. Open up lounge & kitchen area by removing wall.
- Alterations and additions$10k
Installation of a firenzo lady kitchener wet
- Alterations and additions$5,000
Installation of jayline insert is550
- Alterations and additions$60k
It is proposed to relocate a new one bdrm cottage, with a kitchen & shower room with a shower, toilet pan & & basin. The portable unit has been constructed in Auckland & the building is engineered design & has aps1 also a form 2a from t
- Fires and heating$7,000
Install new woodsman Brunner mkiii wood burner
ResidentialCommercial The dots are this page of the list.
Suburbs in Ohai
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.