Building consents
Commercial building consents in Ōhau
Below: 5 commercial consents we hold in Ōhau, searchable and on the map.
Commercial consents on record in Ōhau
Individual building consents we hold, each on its property: 5 from 1 Mar 2021 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New commercial buildings4
1 in the last 12 months · typically $895k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.1mNew res dwg single level 3 bdrm & office, 2 bathrooms & a separate toilet. Dbl gge with internal entry. James hardie linea weatherboard cladding & ezpanel lightweight specialized plaster exterior cladding. 24 St Laurent Way, Ōhau
5 consents
- New commercial buildings$1.1m
New res dwg single level 3 bdrm & office, 2 bathrooms & a separate toilet. Dbl gge with internal entry. James hardie linea weatherboard cladding & ezpanel lightweight specialized plaster exterior cladding.
- New commercial buildings$8.8m
New 5 floors plus basement res & commercial building.This application is for stage 2 structure. Stage 1 civil & basement. Architectural & services will be stage 3; facade in stage 4
- New commercial buildings$650k
New res dwg construction of a new 4 bdrm dwg with attached gge & office. A20230322 change schist cladding with Hinuera stone veneer.
- New commercial buildings$350k
New res dwg construction of a new single storey 2 bdrm, office & 2 bathrm dwg
- New commercial buildings$280k
New res dwg construction of a new 2 storey dwg with 4 bedrooms, 2 bathrooms, office, home theatre & attached dbl gge
ResidentialCommercial The dots are this page of the list.
Suburbs in Ōhau
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.