Building consents
Commercial building consents in Ōhaupō
Below: 10 commercial consents we hold in Ōhaupō, searchable and on the map.
Commercial consents on record in Ōhaupō
Individual building consents we hold, each on its property: 10 from 1 Sep 2020 to 1 Oct 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations5
typically $110k
- Farm buildings2
typically $199k
- New commercial buildings1
typically $389k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
10 consents
- Commercial alterations$150k
250792 - new workshop/shed with studio
- New commercial buildings$389k
250490 - lot 24 - construct a new ancillary building with open-plan living & single gge & bdrm, & office
- Farm buildings$300k
240015 - construct an implement shed with mezzanine area
- Commercial alterations$15k
230422 - gge & office space converted to secondary dwg
- Farm buildings$97k
230013 - construct a detached 10.8 x 9.0m pole shed 9 implement shed
- Commercial alterations$40k
221308 - lot 6 - locate a new transportable home & connect to foundations & services. New building covered by a ccc by Waipa District dc. This will be issued upon completion of the building in the factory
- Commercial alterations$128k
220783 - construct 10.2 x 6m games room/workshop on concrete floor with 7.4 x 3.6m attached veranda on poles/concrete piles
- Commercial alterations$110k
220375 - lot 11 - building a new gge/workshop in rear yard.
- Relocated buildings$355k
210783 - lot 3 - relocate transportable building to site & construct new implement shed
- Commercial alterations$250k
200753 - internal alt & add to existing dwg - add office & reconfigure bathrm & laundry
ResidentialCommercial The dots are this page of the list.
Suburbs in Ōhaupō
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.