Building consents
Commercial building consents in Omaha
Below: 3 commercial consents we hold in Omaha, searchable and on the map.
Commercial consents on record in Omaha
Individual building consents we hold, each on its property: 3 from 1 Oct 2025 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations2
1 in the last 12 months · typically $325k
- New commercial buildings1
1 in the last 12 months · typically $1.5m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.5mRbw - new 2 level dwg, mixture of cedar & brick veneer cladding on sed slab with metal roof & abodo batten screening. Four bdrm, two bathrm, two car gge, laundry, office, lounge, ope 45 Kokopu Street, Ōmaha
- $555kFoundation, ground level slab, ground level columns & posts & precast wall of a new two level mixed use commercial building consists of 16 units with 8 units on each floor. This stage also include 1 Inanga Lane, Ōmaha
3 consents
- New commercial buildings$1.5m
Rbw - new 2 level dwg, mixture of cedar & brick veneer cladding on sed slab with metal roof & abodo batten screening. Four bdrm, two bathrm, two car gge, laundry, office, lounge, ope
- Commercial alterations$555k
Foundation, ground level slab, ground level columns & posts & precast wall of a new two level mixed use commercial building consists of 16 units with 8 units on each floor. This stage also include
- Commercial alterations$95k
Rbw-new accessory building including gym space & bathrm.
ResidentialCommercial The dots are this page of the list.
Suburbs in Omaha
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.