Building consents

Building consents in Ongaonga

Below: 31 consents we hold in Ongaonga, searchable and on the map.

Consents we hold316 in the last 12 monthsSearch them ↓

Consents on record in Ongaonga

Individual building consents we hold, each on its property: 31 from 1 Oct 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Alterations and additions7

    4 in the last 12 months · typically $47k

  2. Fires and heating5

    1 in the last 12 months · typically $6,200

  3. Relocated buildings3

    1 in the last 12 months · typically $50k

  4. Garages, sheds and carports1

    typically $26k

  5. Insulation1

    typically $4,959

  6. Minor dwellings and sleepouts1

    typically $40k

  7. New homes1

    typically $450k

  8. Plumbing, drainage and wastewater1

    typically $25k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01122202420252026November 2023: 1December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 0July 2024: 0August 2024: 0September 2024: 1October 2024: 0November 2024: 0December 2024: 0January 2025: 0February 2025: 0March 2025: 0April 2025: 1May 2025: 1June 2025: 1July 2025: 0August 2025: 0September 2025: 0October 2025: 1November 2025: 1December 2025: 2January 2026: 0February 2026: 0March 2026: 0April 2026: 0May 2026: 2June 2026: 1July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $150k*extension to single storey dwg *proposed ensuite, 92 Taylor Road, Ongaonga
  2. $100kAdd to existing home housing - detached 186 Swamp Road, Ongaonga
  3. $40kNew transportable dwg housing - detached 6/1312 Highway 50, Ongaonga
  4. $20kRelocate dwg housing - detached 41 Ngaruru Road, Ongaonga
  5. $15kRbw - the scope of work: the job involves reworking the upper floor by taking down a non-load-bearing wall, opening up the space between the kitchen & dining area, & adding an ensuite bathrm to 73 Taylor Road, Ongaonga

31 consents

  1. Alterations and additions$150k

    *extension to single storey dwg *proposed ensuite,

    92 Taylor Road, Ongaonga · 1 Jun 2026 · 26/1105

  2. Fires and heating$5,000

    Install fireplace

    613A Blackburn Road, Ongaonga · 1 May 2026 · 26/1064

  3. Alterations and additions$15k

    Rbw - the scope of work: the job involves reworking the upper floor by taking down a non-load-bearing wall, opening up the space between the kitchen & dining area, & adding an ensuite bathrm to

    73 Taylor Road, Ongaonga · 1 May 2026 · BCO10411023

  4. Relocated buildings$20k

    Relocate dwg housing - detached

    41 Ngaruru Road, Ongaonga · 1 Dec 2025 · 25/0279

  5. Alterations and additions$100k

    Add to existing home housing - detached

    186 Swamp Road, Ongaonga · 1 Dec 2025 · 25/0282

  6. Alterations and additions$40k

    New transportable dwg housing - detached

    6/1312 Highway 50, Ongaonga · 1 Nov 2025 · 25/0286

  7. Alterations and additions$47k

    New transportable dwg housing - detached

    613A Blackburn Road, Ongaonga · 1 Oct 2025 · 25/0255

  8. Relocated buildings$50k

    Relocate outbuilding install plumbing & wastewater outbuildings

    88 Bridge Street, Ongaonga · 1 Jun 2025 · 25/0117

  9. Minor dwellings and sleepouts$40k

    New transportable tiny home

    130 Taylor Road, Ongaonga · 1 May 2025 · 25/0103

  10. Plumbing, drainage and wastewater$25k

    New waste water system ancillary

    2 Herrick Street, Ongaonga · 1 Apr 2025 · 25/0039

  11. New homes$450k

    Construction of dwg

    86 Bridge Street, Ongaonga · 1 Sep 2024 · BCN/2024/5628

  12. Garages, sheds and carports$26k

    Construct an il1 gge

    26 Bridge Street, Ongaonga · 1 Nov 2023 · 230412

  13. Fires and heating$2,400

    Install scandia heat & cook freestanding fire housing - detached

    26 Bridge Street, Ongaonga · 1 Aug 2023 · 23/0235

  14. Fires and heating$6,200

    Install firenzo vision ag freestanding fire heating

    22 Stockade Road, Ongaonga · 1 Aug 2023 · 23/0273

  15. Relocated buildings$100k

    Relocate dwg housing - detached

    690 Wakarara Road, Ongaonga · 1 Feb 2023 · 23/0016

  16. Alterations and additions$150k

    Dwg alterations & additions housing - detached

    555 Blackburn Road, Ongaonga · 1 Apr 2022 · 21/0458

  17. Insulation$4,959

    Install insulation housing - detached

    41 Mill Street, Ongaonga · 1 Mar 2022 · 22/0047

  18. Fires and heating$7,000

    Install firenzo freestanding fire housing - detached

    , Ongaonga · 1 Mar 2022 · 22/0076

  19. Alterations and additions$5,500

    Install new fire

    , Ongaonga · 1 Mar 2022 · 220080

  20. Fires and heating$6,500

    Install woodsman freestanding fire with wetback

    207 Hobin Road, Ongaonga · 1 Feb 2022 · 22/0024

  21. Minor dwellings and sleepouts$40k

    Change gge into sleepout housing - detached

    27 Herrick Street, Ongaonga · 1 Jul 2021 · 21/0080

  22. Plumbing, drainage and wastewater$15k

    Install hydrozone waste water system

    35 Bridge Street, Ongaonga · 1 Jul 2021 · 21/0237

  23. Garages, sheds and carports$36k

    New gge outbuildings

    16 Mill Street, Ongaonga · 1 Jun 2021 · 21/0117

  24. Fires and heating$2,450

    Install masport Akaroa freestanding fire heating

    263 Blackburn Road, Ongaonga · 1 May 2021 · 21/0174

  25. Alterations and additions$75k

    Dwg alterations & additions housing - detached

    48 Bridge Street, Ongaonga · 1 Feb 2021 · 20/0333

ResidentialCommercial The dots are this page of the list.

Suburbs in Ongaonga

Where the consents we hold are, most in the last 12 months first.

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.