Building consents
Building consents in Opononi
Below: 48 consents we hold in Opononi, searchable and on the map.
Consents on record in Opononi
Individual building consents we hold, each on its property: 48 from 1 Sep 2019 to 1 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes7
2 in the last 12 months · typically $400k
- Garages, sheds and carports6
1 in the last 12 months · typically $56k
- Alterations and additions6
typically $155k
- Fires and heating4
typically $4,250
- Decks, pergolas and verandahs4
typically $24k
- Plumbing, drainage and wastewater3
1 in the last 12 months · typically $23k
- Relocated buildings3
typically $60k
- Multiple homes1
typically $10m
- Commercial alterations1
typically $70k
- Repairs, recladding and strengthening1
typically $50k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $400kBuilding new home approx 120sqm 53 Opononi Heights Drive, Opononi
- $350kNew home 65 Opononi Heights Drive, Opononi
- $90kConstruction of new gge with was 34 Taumatawiwi Street, Opononi
- $28kNew onsite wastewater management system 99 Waione Road, Opononi
48 consents
- New homes$400k
Building new home approx 120sqm
- New homes$350k
New home
- Plumbing, drainage and wastewater$28k
New onsite wastewater management system
- Garages, sheds and carports$90k
Construction of new gge with was
- Decks, pergolas and verandahs$25k
Replacing old front deck stairs &
- Garages, sheds and carports$55k
Construction of new 2 bay lean shed
- Fires and heating$7,478
New fireplace
- New homes$450k
Prefabricated dwg
- Relocated buildings$50k
Foundations for prefabricated relocated dwg
- Alterations and additions$420k
Additions & alterations to existi
- Fires and heating$3,000
Install of a metro wee rad leg free
- Multiple homes$10m
15 townhouses. Stage 2 is the remaining building work for group dwg
- Plumbing, drainage and wastewater$18k
Installation of on-site wastewater
- Decks, pergolas and verandahs$24k
New deck to replace existing deck
- Relocated buildings$240k
Foundations for a relocatable dwelling
- New homes$950k
5 bdrm dwg with attached gge
- Repairs, recladding and strengthening$50k
Repile dwg
- Alterations and additions$300k
Extension to existing dwg with
- Alterations and additions$80k
New 5 bdrm dwg transported dwg
- Alterations and additions$5,600
Install jayline free-standing wood
- Fires and heating$5,500
Replacement of existing freestanding sfh - metro eco xtreme rad on pedestal
- Alterations and additions$230k
Internal alterations, including bat
- Alterations and additions$80k
Foundations for relocatable detached
- Garages, sheds and carports$57k
Totalspan il1 shed with a washroom.
- Garages, sheds and carports$30k
Versatile single gge/storage
ResidentialCommercial The dots are this page of the list.
Suburbs in Opononi
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.