Building consents
Building consents in Maihiihi
Below: 7 consents we hold in Maihiihi, searchable and on the map.
Consents on record in Maihiihi
Individual building consents we hold, each on its property: 7 from 1 May 2021 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Decks, pergolas and verandahs1
1 in the last 12 months · typically $30k
- Garages, sheds and carports1
1 in the last 12 months · typically $1,000
- Fires and heating1
1 in the last 12 months · typically $7,500
- Alterations and additions1
typically $20k
- Plumbing, drainage and wastewater1
typically $160k
- New homes1
typically $900k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $30kConstruct new timber framed verandah attached to existing res 150 Pamotumotu Road
- $7,500Installation of new woodman Tasman fire place, flue kit, 912A Ngahape Road
- $1,000Additional bay to be closed in shed footprint & location outbuilding 912 Ngahape Road
7 consents
- Garages, sheds and carports$1,000
Additional bay to be closed in shed footprint & location outbuilding
- Fires and heating$7,500
Installation of new woodman Tasman fire place, flue kit,
- Decks, pergolas and verandahs$30k
Construct new timber framed verandah attached to existing res
- Alterations and additions$20k
Bathrm alt. Including wet area shower, new basin, detached dwg
- Plumbing, drainage and wastewater$160k
Site transportable dwg & connect to onsite detached dwg
- New homes$900k
Convert 7 x shipping containers into detached dwg
- Fires and heating$5,000
Installation of a new metro xtreme rad base - Ltd - solid detached dwg
ResidentialCommercial The dots are this page of the list.
Near Maihiihi
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.