Building consents
Building consents in Papatowai
Below: 9 consents we hold in Papatowai, searchable and on the map.
Consents on record in Papatowai
Individual building consents we hold, each on its property: 9 from 1 Aug 2019 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions2
1 in the last 12 months · typically $53k
- Fires and heating2
1 in the last 12 months · typically $7,335
- New commercial buildings1
typically $200k
- New homes1
typically $563k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $15kConstruct new foundations to locate 2 identical code of compliant cabins on site with new drainage & holding tank 2490 Papatowai Highway
- $7,469Remove existing fire & flue. Install new fire & flue (firenzo Bronte ag) 3 Marama Street
9 consents
- Alterations and additions$15k
Construct new foundations to locate 2 identical code of compliant cabins on site with new drainage & holding tank
- Fires and heating$7,469
Remove existing fire & flue. Install new fire & flue (firenzo Bronte ag)
- Fires and heating$7,200
Heater
- Alterations and additions$90k
Siting for transportable dwg x codc - install incinerating toilets
- New homes$563k
Single level dwg with attached gge
- New commercial buildings$200k
New dwg with office, install holding tank & solid fuel heater - yunca monte f/s woodburner
- Garages, sheds and carports$19k
Erect gge
- Decks, pergolas and verandahs$40k
Platform lift from parking area to the deck, alt bathrm
- Garages, sheds and carports$21k
Erect gge on concrete slab
ResidentialCommercial The dots are this page of the list.
Near Papatowai
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.