Building consents
Building consents in Kerepehi
Below: 39 consents we hold in Kerepehi, searchable and on the map.
Consents on record in Kerepehi
Individual building consents we hold, each on its property: 39 from 1 Jul 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating8
2 in the last 12 months · typically $5,000
- Alterations and additions5
typically $50k
- New homes4
1 in the last 12 months · typically $589k
- Relocated buildings3
typically $75k
- Garages, sheds and carports3
typically $50k
- Multiple homes2
typically $1.9m
- Minor dwellings and sleepouts1
typically $100k
- Pools and spas1
typically $100k
- Commercial alterations1
typically $1.3m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $497kRbw - two storey stand-alone dwg, includes living, dining, kitchen, 4 bedrooms, 3 bathrooms, laundry, & attached single gge.
- $6,000Solid fuel heater - jayline fr400 71 Kerepehi Town Road
- $3,500Solid fuel heater - masport Kaituna ultralow emmission 20 Kaikahu Road North
39 consents
- Fires and heating$3,500
Solid fuel heater - masport Kaituna ultralow emmission
- Fires and heating$6,000
Solid fuel heater - jayline fr400
- New homes$497k
Rbw - two storey stand-alone dwg, includes living, dining, kitchen, 4 bedrooms, 3 bathrooms, laundry, & attached single gge.
- Relocated buildings$75k
Relocated dwg - foundations & site works
- Garages, sheds and carports$50k
Gge
- Relocated buildings$90k
Relocated dwg - foundations & site works only
- Alterations and additions$200k
Rbw - internal alterations, including structural works. Alterations to the existing kitchen, stairwell & selected interior spaces.
- Multiple homes$744k
2 new dwgs
- New homes$800k
Rbw - demolish & remove existing minister's dwg. Proposed new dwg to replace existing (270m2) with seven-bedrooms, 3.5 bathrooms, brick & weatherboard cladding, 22 degree colorsteel roof
- Alterations and additions$50k
Internal alt for bathroom
- Pools and spas$100k
Landscaping, relocating spa pool & install new pool fence
- Alterations and additions$30k
Internal dwg alterations - removing internal walls & new beams in roof space
- Fires and heating$6,000
Install woodsman coleridge freestanding fire
- Multiple homes$3m
Rbw lot 1 9 construction of nine 2 storey dwgs. Four duplex units & one detached unit. Each unit consists of 3 bedrooms, 2 baths & wc. Lot 1 7 consists of a single gge
- New homes$680k
New dwg
- New homes$100k
Res/farm- new single bdrm unit (sol)
- Minor dwellings and sleepouts$100k
Res/farm - sleepout with studio & bathrm
- Fires and heating$5,000
Solid fuel heater
- Alterations and additions$200k
Major rebuild of exisiting dwg on same footprint
- Garages, sheds and carports$70k
Gge
- Fires and heating$5,000
Solid fuel heater
- Fires and heating$5,000
Solid fuel heater
- Fires and heating$2,500
Solid fuel heater
- Garages, sheds and carports$20k
Gge
- Fires and heating$2,500
Solid fuel heater
ResidentialCommercial The dots are this page of the list.
Near Kerepehi
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.