Building consents
Building consents in Hikutaia
Below: 21 consents we hold in Hikutaia, searchable and on the map.
Consents on record in Hikutaia
Individual building consents we hold, each on its property: 21 from 1 Mar 2020 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating8
1 in the last 12 months · typically $5,000
- Relocated buildings3
1 in the last 12 months · typically $85k
- New homes2
1 in the last 12 months · typically $280k
- New commercial buildings1
1 in the last 12 months · typically $797k
- Garages, sheds and carports1
typically $96k
- Alterations and additions1
typically $123k
- Minor dwellings and sleepouts1
typically $88k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $797kConstruction of a 3x bdrm 1x office with 2x bathrooms & one separate wc dwg with an attached dbl gge 14 Corbett Road
- $300kProposed 133.80m�, three bdrm dwg with two bathrooms. 9 Ferry Road
- $85kRelocated dwg - foundations & site works 241 Maratoto Road
- $3,000Install a new metrofire tiny rad freestanding solid fuel woodburner 12 Onetai Road
21 consents
- New homes$300k
Proposed 133.80m�, three bdrm dwg with two bathrooms.
- Relocated buildings$85k
Relocated dwg - foundations & site works
- Fires and heating$3,000
Install a new metrofire tiny rad freestanding solid fuel woodburner
- New commercial buildings$797k
Construction of a 3x bdrm 1x office with 2x bathrooms & one separate wc dwg with an attached dbl gge
- Fires and heating$4,000
Housing (detached dwg) - install a replacement fsf metro ambie plus woodburner, new flue & flashings
- Fires and heating$7,320
Install sfh - masport Akaroa freestanding wood fire with ashpan
- New homes$260k
New dwg - not attached to others
- Fires and heating$5,000
Solid fuel heater - metro tiny woody
- Fires and heating$6,000
Installation of a metro eco tiny rad with wetback
- Alterations and additions$123k
Additions & alterations to existing dwg
- Relocated buildings$65k
Proposed relocation of existing dwg from 215 Sutton Rd, Drury to 41 onetai Rd, Hikutaia, including minor alterations to convert to a four bdrm dwg.
- Garages, sheds and carports$96k
Construction of 9m x 14m domestic gge
- Fires and heating$2,500
Solid fuel heater
- Fires and heating$5,000
Solid fuel heater
- Minor dwellings and sleepouts$88k
Construction of new 9m x 6m studio with metro wood fire
- Relocated buildings$110k
Relocation of existing dwg
- Fires and heating$5,000
Free-standing metro xtreme rad woody solid fuel heater
- Alterations and additions$90k
Additions & alterations to building
- Alterations and additions$131k
47.79m2 dwg extension
- Alterations and additions$250k
Existing dwg
- Alterations and additions$20k
Conversion of the existing bathrm on the upper level into 2 bathrooms & a reworking of the layout of the existing ensuite.
ResidentialCommercial The dots are this page of the list.
Near Hikutaia
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.