Building consents

Residential building consents in Shag Point

Below: 8 residential consents we hold in Shag Point, searchable and on the map.

Consents we hold8Search them ↓

Residential consents on record in Shag Point

Individual building consents we hold, each on its property: 8 from 1 Jul 2021 to 1 May 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Alterations and additions2

    typically $33k

  2. New homes2

    typically $520k

  3. Garages, sheds and carports1

    typically $60k

  4. Fires and heating1

    typically $5,000

  5. Repairs, recladding and strengthening1

    typically $5,000

Consents on record by month

The last three years. A recent dip is often records still to arrive.

00111202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 1July 2024: 0August 2024: 0September 2024: 1October 2024: 0November 2024: 0December 2024: 0January 2025: 0February 2025: 0March 2025: 0April 2025: 0May 2025: 1June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 0April 2026: 0May 2026: 0June 2026: 0July 2026: 0August 2026: 0September 2026: 0October 2026: 0

8 consents

  1. New homes$650k

    Construction of a 2 bdrm, 1 bathrm dwg with tropicair rua

    103 Shag Point Road · 1 May 2025 · 2025.9276.1

  2. Alterations and additions$5,000

    Amendment 2023/8392/2 revised foundation details

    171 Shag Point Road · 1 Sep 2024 · 2023.8392.2

  3. New homes$390k

    Construction of a 2 level, 2 bdrm, 2 bathrm dwg with metro

    171 Shag Point Road · 1 Jun 2024 · 2023.8392.1

  4. Garages, sheds and carports$60k

    Construction of a 3 bay mitek pole shed

    215 Shag Point Road · 1 Jun 2023 · 2023.8446.1

  5. Repairs, recladding and strengthening$5,000

    Amendment 2022/8091/2 re-pile front face of dwg, remove window

    95 Shag Point Road · 1 Apr 2023 · 2022.8091.2

  6. Fires and heating$5,000

    Installation of a free-standing yunca monte euro woodburnder

    95 Shag Point Road · 1 Apr 2023 · 2023.8381.1

  7. Alterations and additions$60k

    Alterations to existing dwg to include removal of part exterior

    95 Shag Point Road · 1 Aug 2022 · 2022.8091.1

  8. Fires and heating$7,000

    Installation of free-standing metro mega rad woodburner & eco flue

    189 Shag Point Road · 1 Jul 2021 · 2021.7383.1

ResidentialCommercial The dots are this page of the list.

Near Shag Point

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.