Building consents
Building consents in Parawera
Below: 11 consents we hold in Parawera, searchable and on the map.
Consents on record in Parawera
Individual building consents we hold, each on its property: 11 from 1 Sep 2020 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions4
1 in the last 12 months · typically $72k
- New homes1
1 in the last 12 months · typically $586k
- Farm buildings1
typically $20k
- Fires and heating1
typically $4,500
- Relocated buildings1
typically $75k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $586k260549 - lot 1 - new three bdrm dwg with attached dbl gge 689 Arapuni Road, Parawera
- $65kConstruct an importance level 1 7m x 14m gabled timber pole outbuilding 135 Lethbridge Road, Parawera
11 consents
- New homes$586k
260549 - lot 1 - new three bdrm dwg with attached dbl gge
- Alterations and additions$65k
Construct an importance level 1 7m x 14m gabled timber pole outbuilding
- Alterations and additions$30k
250186 - lot 1 - relocate an existing unit to site, new foundations & drainage
- Relocated buildings$75k
250237 - lot 2 - site works for relocated 4 bdrm dwg - foundations, sw & ww services on site, entry deck & stairs
- Alterations and additions$100k
240798 - lot 1 - relocation of a secondhand three bdrm dwg. Construction of detached gge.
- Farm buildings$20k
240563 - greenhouse construction
- Fires and heating$4,500
220373 - install caldo rad rustic solid fuel heater
- Alterations and additions$79k
211501 - lot 5 - installation of pre moulded fibreglass inground swimming pool, associated filtration & permanent pool fencing.
- Alterations and additions$40k
210596 - Maungatautari 5b 1c 1 block - home relocation + connect to existing septic & stormwater
- Fires and heating$5,000
210090 - install solid fuel heater
- Alterations and additions$40k
200866 - internal renovations to existing bathrm
ResidentialCommercial The dots are this page of the list.
Suburbs in Parawera
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.