Building consents
Building consents in Pataua North
Below: 12 consents we hold in Pataua North, searchable and on the map.
Consents on record in Pataua North
Individual building consents we hold, each on its property: 12 from 1 Nov 2019 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions7
2 in the last 12 months · typically $20k
- New homes2
typically $1.3m
- Decks, pergolas and verandahs1
typically $135k
- Plumbing, drainage and wastewater1
typically $20k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $250kBdrm, living & bathrm extens 21 Hall Road, Pataua North
- $12kInternal alterations to existing dwg (tiled shower) housing - detached 21 Hall Road, Pataua North
12 consents
- Alterations and additions$250k
Bdrm, living & bathrm extens
- Alterations and additions$12k
Internal alterations to existing dwg (tiled shower) housing - detached
- Alterations and additions$120k
Alt to existing dwg - basement
- New homes$1m
New dwg, two sleepouts & wastewater system
- Alterations and additions$20k
New dwg & minor dwg amendment 1: alterations to proposed dwg & minor dwg - cladding, bracing, califont, window layout to minor dwg, skylights & truss layout
- Decks, pergolas and verandahs$135k
Add & alt to existing dwg - kitchen, bathrm, stairs & deck
- Alterations and additions$20k
New dwg amendment 1: brick cladding changed to nuwall, new storage room added to ground floor, w14 deleted.
- Alterations and additions$7,100
New heating appliance
- New homes$1.6m
New dwg & minor dwg
- Alterations and additions$24k
Installation of a naturalflow nf8000p treatment system, fed through soakage beds for a future dwg arrangement
- Plumbing, drainage and wastewater$20k
New effluent system
- Decks, pergolas and verandahs$30k
Add to existing dwg - deck
ResidentialCommercial The dots are this page of the list.
Suburbs in Pataua North
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.