Building consents
Residential building consents in Patearoa
Below: 20 residential consents we hold in Patearoa, searchable and on the map.
Residential consents on record in Patearoa
Individual building consents we hold, each on its property: 20 from 1 Feb 2020 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating4
3 in the last 12 months · typically $6,500
- New homes4
typically $390k
- Alterations and additions2
1 in the last 12 months · typically $190k
- Garages, sheds and carports2
typically $214k
- Relocated buildings2
typically $45k
- Minor dwellings and sleepouts1
1 in the last 12 months · typically $106k
- Decks, pergolas and verandahs1
typically $50k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $180kAdditions & alterations to existing dwg housing - detached 40 McSkimming Road, Patearoa
- $106kNew dbl gge with attached sleepout 71 Aitken Road, Patearoa
- $10kNew freestanding fireplace housing - detached 1 Chirnside Terrace, Patearoa
- $8,000New maxen Forbury 500 insert woodfire housing - detached 46 McSkimming Road, Patearoa
- $5,000Install a new heating appliance - wood burner. , Patearoa
20 consents
- Fires and heating$5,000
Install a new heating appliance - wood burner.
- Minor dwellings and sleepouts$106k
New dbl gge with attached sleepout
- Alterations and additions$180k
Additions & alterations to existing dwg housing - detached
- Fires and heating$10k
New freestanding fireplace housing - detached
- Fires and heating$8,000
New maxen Forbury 500 insert woodfire housing - detached
- Garages, sheds and carports$350k
New gge with bathrm & laundry outbuildings
- Alterations and additions$200k
Additions & alterations to existing dwg housing - detached
- New homes$180k
New one bdrm dwg housing - detached
- Relocated buildings$70k
Relocation of existing dwg (two bdrm dwg) housing - detached
- New homes$605k
New three bdrm dwg with attached dbl gge housing - detached
- New homes$600k
New three bdrm dwg with attached carport
- Decks, pergolas and verandahs$50k
Additions & alterations to existing dwg (verandah, housing - detached
- Garages, sheds and carports$78k
New three bay shed
- New homes$138k
New two bdrm house with attached shed
- Fires and heating$3,000
Install new metro fireplace heating
- Relocated buildings$20k
Foundations & siteworks for new relocatable dwg. Housing - detached
- Alterations and additions$250k
Internal alterations to existing dwg (re clad walls/ housing - detached
- New homes$312k
New three-bdrm dwg housing - detached, ...
- Decks, pergolas and verandahs$16k
Replacing deck & veranda with larger veranda structure housing - detached
- Alterations and additions$5,000
Installation of new eds system (design originally consented
ResidentialCommercial The dots are this page of the list.
Suburbs in Patearoa
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.