Building consents
Building consents in Pauanui
Below: 404 consents we hold in Pauanui, searchable and on the map.
Consents on record in Pauanui
Individual building consents we hold, each on its property: 404 from 1 May 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes76
15 in the last 12 months · typically $695k
- Alterations and additions59
17 in the last 12 months · typically $85k
- Fires and heating35
9 in the last 12 months · typically $6,000
- Decks, pergolas and verandahs20
7 in the last 12 months · typically $80k
- Minor dwellings and sleepouts19
3 in the last 12 months · typically $76k
- Garages, sheds and carports19
1 in the last 12 months · typically $100k
- Repairs, recladding and strengthening13
4 in the last 12 months · typically $80k
- Pools and spas6
typically $43k
- Relocated buildings6
typically $70k
- Multiple homes2
1 in the last 12 months · typically $1.9m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.4mRbw - 2 x 2-storey dwgs with four bedrooms 2.5 baths. Attached single gge & new detention tanks. 4 x 2-storey dwgs with three bedrooms, 2.5 baths, attached single gge & new detenti 29 Glen Venus, Pauanui
- $2.4mDemolish existing 2 level house to slab, construct 5 bedrm dwg w/attached dbl gge; 2 living rms; bedrm1 ensuite; ensuite for 2nd & 3rd bedrms; 2 wcs; lower deck & 2 upper decks. 629 Waterways Parade, Pauanui
- $1mTo construct a new 3 bdrm dwg with single attached gge 26 Coronation Row, Pauanui
- $950kNew four bdrm dwg with attached gge 3 The Dunes, Pauanui
- $900kConstruct 3 bdrm domestic dwg with attached gge & covered decks 5 Ian Hopper Way, Pauanui
404 consents
- New homes$410k
New 3 bdrm dwg with attached gge
- Fires and heating$10k
Installation of a ravelli rosa pellet fire to manufacturers specifications
- Fires and heating$7,000
Alt to dwg - installation of a woodsman kanaku (uleb) dry freestanding woodburner - cac223218
- Multiple homes$2.4m
Rbw - 2 x 2-storey dwgs with four bedrooms 2.5 baths. Attached single gge & new detention tanks. 4 x 2-storey dwgs with three bedrooms, 2.5 baths, attached single gge & new detenti
- New homes$900k
Construct 3 bdrm domestic dwg with attached gge & covered decks
- Minor dwellings and sleepouts$350k
Demolish the existing sleepout & rebuild a new 2 bdrm sleepout. Alterations including a new ensuite & open plan living to the existing dwg. New soak pit for sw disposal
- New homes$1m
To construct a new 3 bdrm dwg with single attached gge
- Alterations and additions$5,000
Proposed internal alt to move laundry tub, remove wc, remove some internal walls & infill frame other openings
- Decks, pergolas and verandahs$95k
Proposed replacement deck & stairs with roof extended awning over deck, roofing & spouting system changed, & bdrm 1 window changed to sliding door to deck.
- Alterations and additions$150k
Refurbish 3 existing bathrooms with new tiled hob type showers, new tiles, joinery & plumbing fittings,. Upgrade affected wet area linings, waterproofing & reposition brace positions outside showers. Refurbish kitchen area, new internal walls
- Repairs, recladding and strengthening$35k
Re-clad upper floor of existing dwg, re-roof entire dwg
- Fires and heating$6,000
Install a metro xtreme leg woodburner into the lounge
- Fires and heating$6,625
Installation of solid wood burner (metro xtreme rad)
- Alterations and additions$500
Add of shower & tub installed after completion of bc101020
- New homes$950k
New four bdrm dwg with attached gge
- Alterations and additions$1
Amendment - modification of building code clause b2.3.1 to housing - detached dwgs
- Alterations and additions$2,968
C1 - new tiled shower to replace shower over bath.
- New homes$350k
Construct 3 bdrm domestic dwg.
- New homes$2.4m
Demolish existing 2 level house to slab, construct 5 bedrm dwg w/attached dbl gge; 2 living rms; bedrm1 ensuite; ensuite for 2nd & 3rd bedrms; 2 wcs; lower deck & 2 upper decks.
- New homes$880k
To construct a new 2 level 4 bdrm dwg with dbl attached gge
- Fires and heating$6,000
Installation of a metro tiny rad woodfire.
- Decks, pergolas and verandahs$95k
Rbw - demolition of enclosed deck & pergola, construction of new enclosed deck with aluminium louvre. Removal of 2 existing joinery units, replace with new. New structure to support deck, louvre fra
- Alterations and additions$280k
Extension of lounge & kitchen to existing dwg
- Alterations and additions$377k
Lounge, bdrm & ensuite add to existing 2 bdrm lockwood dwg
- New homes$400k
Construct 3 bdrm domestic dwg with attached dbl gge
ResidentialCommercial The dots are this page of the list.
Suburbs in Pauanui
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.