Building consents

Building consents in Onapua Bay

Below: 27 consents we hold in Onapua Bay, searchable and on the map.

Consents we hold27Search them ↓

Consents on record in Onapua Bay

Individual building consents we hold, each on its property: 27 . Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

Consents on record by month

The last three years. A recent dip is often records still to arrive.

00111202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 0July 2024: 0August 2024: 0September 2024: 0October 2024: 0November 2024: 0December 2024: 0January 2025: 0February 2025: 0March 2025: 0April 2025: 0May 2025: 0June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 0April 2026: 0May 2026: 0June 2026: 0July 2026: 0August 2026: 0September 2026: 0October 2026: 0

27 consents

  1. Alterations and additions

    Additions

    · BC010381

  2. Alterations and additions

    Replace Existing Jetty

    · BC011089

  3. Relocated buildings

    Relocate Building for Sleep Out Use

    · BC020677

  4. Alterations and additions

    Alteration

    · BC020705

  5. Fires and heating

    Free Standing Kent Tile Log Fire

    · BC020914

  6. Fires and heating

    Free Standing Masport LE 3000 Log Fire

    · BC030083

  7. Fires and heating

    Replacement Flue for Existing Fire

    · BC031565

  8. Alterations and additions

    Addition

    · BC040401

  9. Pools and spas

    Swimming Pool

    · BC050315

  10. Fires and heating

    Free Standing Metro Pioneer Wee Rad Log Fire

    · BC051378

  11. New homes

    Dwelling

    · BC070510

  12. Garages, sheds and carports

    Goldpine Kitset Barn

    · BC071396

  13. Alterations and additions

    Extension

    · BC141120

  14. Fires and heating

    Free Standing Masport R1500 Ped Log Fire

    · BC160237

  15. Alterations and additions

    Replace Existing Wall Cladding/Aluminium Windows & Doors

    · BC190095

  16. Minor dwellings and sleepouts

    Free-Standing Warmington Studio 14 Log Fire

    · BC201164

  17. Fires and heating

    Inbuilt Solid Fuel Heater

    · BC220296

  18. New homes

    Dwelling with Free-Standing Warmington Solid Fuel Heater & Wastewater System

    22 Missionary Bay · BC230586

  19. Pools and spas

    Swimming Pool Fencing

    · BC250134

  20. Fires and heating

    Free-Standing Metro Wee Solid Fuel Heater

    · BC250177

  21. New homes

    Domestic Dwelling

    · BC950924

  22. Fires and heating

    Install freestanding Masport log fire

    · BC951601

  23. Fires and heating

    Installation of Freestanding Masport Logfire

    · BC970480

  24. New homes

    Dwelling, Septic Tank and Retaining Walls

    · BC980265

  25. Alterations and additions

    Extension

    · BC980990

ResidentialCommercial The dots are this page of the list.

Near Onapua Bay

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.