Building consents
Building consents in Ngākuta Bay
Below: 36 consents we hold in Ngākuta Bay, searchable and on the map.
Consents on record in Ngākuta Bay
Individual building consents we hold, each on its property: 36 from 1 Apr 2020 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions8
1 in the last 12 months · typically $125k
- Retaining walls5
3 in the last 12 months · typically $30k
- Fires and heating5
typically $8,000
- New homes4
1 in the last 12 months · typically $625k
- Plumbing, drainage and wastewater3
typically $25k
- Garages, sheds and carports2
1 in the last 12 months · typically $61k
- Decks, pergolas and verandahs2
typically $65k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $790kDwg & solid fuel heater 26 Brough Place
- $80kBdrm extension with ensuite 2330 Queen Charlotte Drive
- $66kReplacement wastewater system with retaining walls 2330 Queen Charlotte Drive
- $60kSite works/retaining walls 2069 Queen Charlotte Drive
- $50kShed & retaining wall 23 Manuka Drive
36 consents
- Garages, sheds and carports$50k
Shed & retaining wall
- New homes$790k
Dwg & solid fuel heater
- Retaining walls$60k
Site works/retaining walls
- Alterations and additions$80k
Bdrm extension with ensuite
- Retaining walls$23k
Retaining wall with balustrade
- Retaining walls$66k
Replacement wastewater system with retaining walls
- Retaining walls$12k
Site works/retaining walls
- New homes$500k
Rbw - new detached single level minor dwg with one bdrm, 1.5 bathrooms, kitchen, dining, living, & internal access farm implement storage.
- Plumbing, drainage and wastewater$30k
New wastewater system
- Plumbing, drainage and wastewater$10k
Drainage work
- Alterations and additions$1
Amendment to bc240981: extension of balustrades & changes to stairs & deck construction
- Fires and heating$250k
Dwg extensions & alterations with free-standing solid fuel heater
- Alterations and additions$1
Amendment to bc240387: delete proposed extension from ground floor plan
- Fires and heating$8,000
Free standing Ravelli Rosa solid fuel heater
- Alterations and additions$290k
Res alterations & additions
- Decks, pergolas and verandahs$30k
Amendment to BC230797: alterations to rumpus room & replacement deck
- Decks, pergolas and verandahs$100k
Deck extension & partial cladding change
- Alterations and additions$300k
Res alterations & additions
- Fires and heating$9,000
Free-standing yunca monte base solid fuel heater
- Alterations and additions$150k
Res alterations & additions
- Fires and heating$8,000
Inbuilt metro smart insert solid fuel heater
- Garages, sheds and carports$71k
Pole shed
- Fires and heating$5,500
Free standing jayline ffr300 solid fuel heater
- New homes$750k
Dwg & solid fuel heater
- Alterations and additions$99k
Res alterations & additions
ResidentialCommercial The dots are this page of the list.
Near Ngākuta Bay
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.