Building consents
Commercial building consents in Pirongia
Below: 3 commercial consents we hold in Pirongia, searchable and on the map.
Commercial consents on record in Pirongia
Individual building consents we hold, each on its property: 3 from 1 Dec 2022 to 1 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations2
2 in the last 12 months · typically $129k
- New commercial buildings1
typically $645k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $200k260066 - lot 2 - dwg 1: relocation of existing 3-bdrm, 1-bathrm dwg with kitchen, dining, living, office & laundry dwelling 2: relocation of existing 2-bdrm, 1-bathrm dwg with kitchen, dining, living & office 724 Beechey Street, Pirongia
- $58k260266 - to construct a new extension of existing gge as a workshop 510 Beechey Street, Pirongia
3 consents
- Commercial alterations$58k
260266 - to construct a new extension of existing gge as a workshop
- Commercial alterations$200k
260066 - lot 2 - dwg 1: relocation of existing 3-bdrm, 1-bathrm dwg with kitchen, dining, living, office & laundry dwelling 2: relocation of existing 2-bdrm, 1-bathrm dwg with kitchen, dining, living & office
- New commercial buildings$645k
221338 - lot 219 - build a new 349.59 square metre single level private dwg for 2 people.This private dwg consists of 3 bedrooms, an office/study & a craft room. One bathrm with a separate toilet & an ensuite off the master bdrm. A
ResidentialCommercial The dots are this page of the list.
Suburbs in Pirongia
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.