Building consents
Building consents in Pollok
Below: 52 consents we hold in Pollok, searchable and on the map.
Consents on record in Pollok
Individual building consents we hold, each on its property: 52 from 1 Nov 2019 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating21
7 in the last 12 months · typically $6,000
- Alterations and additions6
1 in the last 12 months · typically $69k
- New homes2
2 in the last 12 months · typically $750k
- Pools and spas1
1 in the last 12 months · typically $9,500
- Decks, pergolas and verandahs1
1 in the last 12 months · typically $50k
- Relocated buildings1
typically $75k
- Plumbing, drainage and wastewater1
typically $70k
- Minor dwellings and sleepouts1
typically $900k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $800kConstruction of dwg 34 Cemetery Road
- $700kRbw - proposed single level dwg with four bedrooms, 2 bathrooms 1 wc, study & solid wood fuel fireplace. Includes new onsite wastewater system, stormwater tank & disposal system. 1000 Kohekohe-Karioitahi Road
- $132kRbw - replacement of existing concrete tile roof with corrugate. Change from hip to gable end at northern end of roof. Replacement of all guttering & downpipes. 2 Craig Road
- $50kAdd deck with access stairs to dwg 3 Martin Road
- $9,500Existing pool being replaced with new fibreglass pool under 25,000 litres. Pool fencing unchanged other than pool pump shed added. 206 Given Road
52 consents
- Fires and heating$6,000
Installation of a solid fuel heater to manufacturers specifications - metro wee rad woody
- New homes$800k
Construction of dwg
- Fires and heating$6,000
Installation of a solid fuel heater to manufacturers specifications - metro wee rad leg to replace existing fire.
- Fires and heating$6,000
Installation of a solid fuel heater to manufacturers specifications - maxen kinmont 350p wood fire.
- Fires and heating$8,000
Install solid fuel burner in dwg
- Fires and heating$6,000
Installation of a solid fuel heater to manufacturers specifications masport r1200 ped wood fire replaces existing fire
- Fires and heating$7,000
Installation of a solid fuel heater to manufacturers specifications kent Ruapehu replaces existing fire
- Fires and heating$7,000
Installation of a solid fuel heater to manufacturers specifications masport r5000 leg replaces existing fire
- New homes$700k
Rbw - proposed single level dwg with four bedrooms, 2 bathrooms 1 wc, study & solid wood fuel fireplace. Includes new onsite wastewater system, stormwater tank & disposal system.
- Pools and spas$9,500
Existing pool being replaced with new fibreglass pool under 25,000 litres. Pool fencing unchanged other than pool pump shed added.
- Alterations and additions$132k
Rbw - replacement of existing concrete tile roof with corrugate. Change from hip to gable end at northern end of roof. Replacement of all guttering & downpipes.
- Decks, pergolas and verandahs$50k
Add deck with access stairs to dwg
- Plumbing, drainage and wastewater$70k
Rbw - rumpus alterations, including converting a toilet to a bathrm.
- Fires and heating$9,166
Installation of a new insert solid fuel heater - kent Rata
- Fires and heating$7,000
Installation of a solid fuel heater to manufacturers specifications metro xtreme rad woody wood fire
- Fires and heating$4,500
Installation of new solid fuel heater (metro tiny rad woody)
- Fires and heating$6,455
Sfh - installation of solid fuel heater as per manufacturers specifications (yunca oscar).
- Fires and heating$7,166
Installation of a solid fuel heater to manufacturers specifications. Metro ambie plus wood fire replaces existing wood fire.
- Relocated buildings$75k
Relocate dwg to site housing - detached
- Alterations and additions$242k
rbw - alterations to existing dwg. Internal renovation & reconfiguration of 2 bedrooms, 1 bathrm, living, dining & kitchen areas. Moving bdrm & bathrm to new location, creating a smaller bathrm, moving living & dining to opp. Side.
- Fires and heating$3,829
Installation of solid fuel heater as per manufacturers specifications (jayline fr300)
- Alterations and additions$7,000
installation of a ww system.
- Fires and heating$4,577
installation of a solid fuel heater to manufacturers specifications masport r3000.
- Fires and heating$4,912
installation of solid fuel heater as per manufacturers specifications (jayline fr300)
- Alterations and additions$43k
Rbw - 301090 southcombe new two bdrm dwg transported to site placed on timber piles, includes all relevant site works & foundations
ResidentialCommercial The dots are this page of the list.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.