Building consents

Residential building consents in Port Chalmers

Below: 81 residential consents we hold in Port Chalmers, searchable and on the map.

Consents we hold818 in the last 12 monthsSearch them ↓

Residential consents on record in Port Chalmers

Individual building consents we hold, each on its property: 81 from 1 Sep 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating24

    2 in the last 12 months · typically $6,000

  2. Alterations and additions10

    1 in the last 12 months · typically $42k

  3. New homes7

    2 in the last 12 months · typically $350k

  4. Plumbing, drainage and wastewater6

    1 in the last 12 months · typically $18k

  5. Garages, sheds and carports5

    1 in the last 12 months · typically $40k

  6. Minor dwellings and sleepouts3

    1 in the last 12 months · typically $150k

  7. Multiple homes2

    typically $3.2m

  8. Decks, pergolas and verandahs2

    typically $12k

  9. Relocated buildings2

    typically $58k

  10. Repairs, recladding and strengthening1

    typically $30k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01234202420252026November 2023: 1December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 1June 2024: 2July 2024: 2August 2024: 4September 2024: 4October 2024: 0November 2024: 1December 2024: 1January 2025: 1February 2025: 1March 2025: 2April 2025: 1May 2025: 3June 2025: 2July 2025: 2August 2025: 2September 2025: 0October 2025: 0November 2025: 1December 2025: 0January 2026: 0February 2026: 0March 2026: 4April 2026: 0May 2026: 0June 2026: 3July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $600kDemolish dwg & remove water tank, new dwg with attached gge, install roaring meg mighty meg eco heater, water tank & septic tank with effluent dispersal field 135 Pūrākaunui Road, Mihiwaka
  2. $150kNew dwg, install septic system & water tanks 27 Boundary Street, Pūrākaunui
  3. $40kErect gge with attached games room 162 Pūrākaunui Road, Mihiwaka
  4. $33kExtend dwg to create sunroom 136 Aramoana Road, Deborah Bay
  5. $20kReplace septic tank with effluent dispersal field 11 Driver Street, Long Beach

81 consents

  1. New homes$150k

    New dwg, install septic system & water tanks

    27 Boundary Street, Pūrākaunui · 1 Jun 2026 · 100/26

  2. Garages, sheds and carports$40k

    Erect gge with attached games room

    162 Pūrākaunui Road, Mihiwaka · 1 Jun 2026 · 473/26

  3. Minor dwellings and sleepouts$1,000

    Install solid fuel burner in sleepout

    65 Driver Street, Long Beach · 1 Jun 2026 · 666/26

  4. Fires and heating$6,000

    Install firenzo vision ag - logbox heater in dwg

    130 Aramoana Road, Deborah Bay · 1 Mar 2026 · 128/26

  5. Fires and heating$5,000

    Install maxen kinmont 350-w heater in dwg

    47 Driver Street, Long Beach · 1 Mar 2026 · 186/26

  6. Plumbing, drainage and wastewater$20k

    Replace septic tank with effluent dispersal field

    11 Driver Street, Long Beach · 1 Mar 2026 · 197/26

  7. New homes$600k

    Demolish dwg & remove water tank, new dwg with attached gge, install roaring meg mighty meg eco heater, water tank & septic tank with effluent dispersal field

    135 Pūrākaunui Road, Mihiwaka · 1 Mar 2026 · 45/26

  8. Alterations and additions$33k

    Extend dwg to create sunroom

    136 Aramoana Road, Deborah Bay · 1 Nov 2025 · 1530/25

  9. Alterations and additions$450k

    Rbw - additions & alterations to existing dwg. Demolition or existing building & sheds, new 2 storey add & alt to existing dwg. New gge, workshop, 4 bedrooms, kitchen, dinin

    82 Beach Road, Long Beach · 1 Aug 2025 · BCO10397095

  10. Alterations and additions$300k

    Rbw - interior renovation works. Ground floor includes new lining & floor finishes, new structural openings to masonry walls, new kitchen, new laundry & wc. First floor includes new floor framing

    46A Bay Road, Pūrākaunui · 1 Aug 2025 · BCO10400445

  11. Fires and heating$4,000

    Install woodsman kanaku heater in dwg

    18 Rowland Street, Osborne · 1 Jul 2025 · 977/25

  12. Multiple homes$2.4m

    Rbw - proposed new development of 6 new dwgs (& 1xcoal) comprising five x two-storey attached dwgs & one x two-storey standalone dwg. Intertenancy barrier walls, drain bridging

    3 Albert Road, Osborne · 1 Jul 2025 · BCO10395029

  13. Fires and heating$7,000

    Install metro wee rad curve heater in dwg

    289 Aramoana Road, Deborah Bay · 1 Jun 2025 · 884/25

  14. Alterations and additions$19k

    Rbw- proposed lining & wall bracing with three new windows to existing gge space.

    18 Bay Road, Pūrākaunui · 1 Jun 2025 · BCO10396232

  15. Fires and heating$30k

    Form bathrm in shed, install metro rad plus heater, hot water cylinder & septic system

    50 Mopanui Road, Mihiwaka · 1 May 2025 · 365/25

  16. Fires and heating$7,500

    Free standing woodsman Brunner mkii solid fuel heater

    22 Beach Road, Long Beach · 1 May 2025 · BC250394

  17. New homes$800k

    Rbw - new dwg, 2 storeys, 4 bedrooms, 1 ensuite, 1 bathrm, 1 wc & laundry. Timber shiplap, vertical metal cladding, & aluminium joinery. Timber framed walls, sip floor & roof panels, conc

    56 Hill Street, Pūrākaunui · 1 May 2025 · BCO10394671

  18. Relocated buildings$80k

    Relocation of existing dwg

    5 Hill Street, Pūrākaunui · 1 Apr 2025 · BC2500081

  19. Minor dwellings and sleepouts$400k

    Alt dwg, install warmington studio stove & warmington si 1100 heaters, erect deck & construct block wall

    378 Heyward Point Road, Heyward Point · 1 Mar 2025 · 2155/24

  20. Fires and heating$4,000

    Install masport Kaituna heater in dwg

    195 Pūrākaunui Road, Mihiwaka · 1 Mar 2025 · 271/25

  21. Alterations and additions$200k

    Rbw- first floor: to re-move internal walls & add internal walls to create a bigger kitchen & guest bdrm with ensuite. Basement area: to add internal walls for ensuite for bdrm 1 & 3 extra

    20 Albert Road, Osborne · 1 Feb 2025 · BCO10390772

  22. New homes$2.1m

    Rbw - units 1 & 2 two-storey terraced building with three bedrooms, two bathrooms, wc, dining & kitchen. Units 3 - 8 two-storey terraced building with two bedrooms, study, one bathrm, wc, dining

    18 Albert Road, Osborne · 1 Jan 2025 · BCO10387243

  23. Fires and heating$7,530

    Wood burner - blaze king sirocco sc20p freestanding detached dwg

    4 Osborne Road, Pūrākaunui · 1 Dec 2024 · 24/0431

  24. Garages, sheds and carports$75k

    Gge/shed - no services construction of a new gge

    18 Albert Road, Osborne · 1 Nov 2024 · 2024/472

  25. Plumbing, drainage and wastewater$27k

    Alt internal layout of bathrm, install hand-basin in separate toilet of dwg

    294 Blueskin Road, Mihiwaka · 1 Sep 2024 · 1317/24

ResidentialCommercial The dots are this page of the list.

Suburbs in Port Chalmers

Where the consents we hold are, most in the last 12 months first.

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Dunedin City Council.