Building consents

Commercial building consents in Paerata

Below: 7 commercial consents we hold in Paerata, searchable and on the map.

Consents we hold73 in the last 12 monthsSearch them ↓

Commercial consents on record in Paerata

Individual building consents we hold, each on its property: 7 from 1 Oct 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Commercial alterations4

    3 in the last 12 months · typically $47k

  2. New commercial buildings2

    typically $615k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01122202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 0July 2024: 0August 2024: 2September 2024: 0October 2024: 0November 2024: 0December 2024: 1January 2025: 0February 2025: 0March 2025: 0April 2025: 0May 2025: 0June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 0December 2025: 0January 2026: 1February 2026: 1March 2026: 0April 2026: 0May 2026: 0June 2026: 0July 2026: 1August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $75kNew workshop & changing shed with washroom shower & wc. 21 Loxton Lane
  2. $20kAdd of bathrm & workshop within existing gge 8 Donald Gavin Way
  3. $4,999Installing new tiled shower system & vanity into existing workshop 9A Loxton Lane

7 consents

  1. Commercial alterations$20k

    Add of bathrm & workshop within existing gge

    8 Donald Gavin Way · 1 Jul 2026 · BCO10415101

  2. Commercial alterations$4,999

    Installing new tiled shower system & vanity into existing workshop

    9A Loxton Lane · 1 Feb 2026 · BCO10406916

  3. Commercial alterations$75k

    New workshop & changing shed with washroom shower & wc.

    21 Loxton Lane · 1 Jan 2026 · BCO10404275

  4. Commercial alterations$250k

    New workshop with shower room.

    50 Bush Road · 1 Dec 2024 · BCO10383992

  5. New commercial buildings$583k

    Rbw: new single level with three bedrooms, office & attached gge. Private drainage & underground tanks.

    29 Tirikatene Avenue · 1 Aug 2024 · BCO10383267

  6. New commercial buildings$647k

    Rbw: new single storey dwg, including two bedrooms, media room, kitchen, office & two bathrooms. Dbl attached gge.

    7 Maurice Harding Avenue · 1 Aug 2024 · BCO10385054

  7. Commercial alterations$10k

    owner-builder rbw - converting an existing office which is next to the master bdrm into a walk in wardrobe & en-suite. To create a master suite

    992 Paerata Road · 1 Oct 2019 · BCO10295887

ResidentialCommercial The dots are this page of the list.

Near Paerata

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Auckland Council.