Building consents
Residential building consents in Waiau Pā
Below: 76 residential consents we hold in Waiau Pā, searchable and on the map.
Residential consents on record in Waiau Pā
Individual building consents we hold, each on its property: 76 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating15
4 in the last 12 months · typically $6,707
- Pools and spas15
1 in the last 12 months · typically $50k
- Alterations and additions8
2 in the last 12 months · typically $19k
- Garages, sheds and carports6
typically $154k
- New homes6
typically $638k
- Repairs, recladding and strengthening3
typically $200k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $400kRbw - new pool, decking & pool house. New shade structure (roof) outside of existing house. 16 Church View Road
- $400kProposed extension house to join the existing main house. Extension includes shelter outdoor living area, kitchen, pantry, dining, family area, laundry,2.5 bathrooms,3 bedrooms. 91D Estuary View Road
- $9,800Alterations to the bathrm ensuite 422 Waiau Pa Road
- $9,000Sfh fixed fee - installation of a solid fuel heater to manufacturers specifications ravelli rosa pellet fire. 47 Estuary View Road
- $8,000Installation of a solid fuel heater to manufacturers specifications - maxen kinmont 450p to replace existing fire 413 Seagrove Road
76 consents
- Alterations and additions$9,800
Alterations to the bathrm ensuite
- Fires and heating$8,000
Installation of a solid fuel heater to manufacturers specifications - maxen kinmont 450p to replace existing fire
- Pools and spas$400k
Rbw - new pool, decking & pool house. New shade structure (roof) outside of existing house.
- Fires and heating$6,978
Installation of solid fuel heater to manufacturers specification (maxen kinmont 450-p)
- Alterations and additions$400k
Proposed extension house to join the existing main house. Extension includes shelter outdoor living area, kitchen, pantry, dining, family area, laundry,2.5 bathrooms,3 bedrooms.
- Fires and heating$9,000
Sfh fixed fee - installation of a solid fuel heater to manufacturers specifications ravelli rosa pellet fire.
- Fires and heating$7,800
Installation of a solid fuel heater to manufacturers specifications masport Akaroa replaces existing fire
- Pools and spas$60k
Installation of new ringfenced pool fencing & gate. Fibreglass inground pool over 35,000l.
- Garages, sheds and carports$99k
Rbw - proposed res house extension. A new dbl gge is added to the existing house, with no other changes made.
- Fires and heating$6,500
Installation of a solid fuel heater to manufacturers specifications metro smart insert replaces existing fire.
- Repairs, recladding and strengthening$17k
Bathrm remedial work including removal of existing fittings, replacement of water-damaged framing, new waterproofing system, tiling to walls & floor, & installation of new shower glass, plumbing
- Fires and heating$5,000
Sfh fixed fee: replace existing solid fuel heater (metro wee rad)
- Pools and spas$55k
Installation of new ringfenced pool fencing & gate. Fibreglass inground pool over 35,000l.
- Fires and heating$5,600
Installation of a solid fuel heater to manufacturers specifications kent Oxford wood fire replaces existing wood fire.
- Repairs, recladding and strengthening$350k
Rbw - reclad - partial reclad to existing two-level dwg with stone cladding over cavity to upper floor, living room & foyer only for fire damage restoration. New metal tile roof, membrane deck,
- Garages, sheds and carports$210k
Rbw - extension, renovation to living areas & gge.
- New homes$180k
Rbw - minor dwg 60m2. One bdrm, bath, kitchen & lounge.
- Pools and spas$8,000
Install new pool fencing.
- Fires and heating$7,335
Installation of a solid fuel heater to manufacturers specifications - metro xtreme rad base fire to replace existing fire.
- Alterations and additions$9,500
Rbw - amendment to bco10367761 - new concrete nib to replace brick nib to underside of exterior timber walls, change gge doors to be aluminium sliding doors, laundry window & side door size chang
- Pools and spas$60k
Installation of new rizzare vt2 pool fencing & gates & aluminium pool fencing. Fibreglass inground pool over 35,000 litres,
- New homes$384k
Rbw - construct a single level three-bdrm dwg on concrete foundation with attached gge
- Pools and spas$55k
installation of new rizzare vt2 pool fencing & gates & delta aluminum pool fencing. Fibreglass inground pool over 35,000 litres. Wastewater, relocation of treated effluent land disposal.
- New homes$1.2m
Rbw -new single level dwg, 4 bedrooms, 3 bathrooms, 1 toilet, dbl gge & workshop. New retaining wall to western boundary, & new private drainage, wastewater, stormwater.
- Fires and heating$6,284
installation of a solid fuel heater to manufacturers specifications yunca monte base.
ResidentialCommercial The dots are this page of the list.
Near Waiau Pā
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.