Building consents
Building consents in Pukenui
Below: 33 consents we hold in Pukenui, searchable and on the map.
Consents on record in Pukenui
Individual building consents we hold, each on its property: 33 from 1 Jul 2019 to 1 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating5
2 in the last 12 months · typically $5,600
- Garages, sheds and carports3
typically $86k
- New homes3
typically $437k
- Alterations and additions3
typically $100k
- New commercial buildings1
1 in the last 12 months · typically $1.5m
- Other new buildings1
typically $345k
- Commercial alterations1
typically $22k
- Decks, pergolas and verandahs1
typically $20k
- Plumbing, drainage and wastewater1
typically $13k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.5mRbw - new 5 townhouses (lot 1-5) with 3 levels dwg. Lot 1-5 includes a single gge, two bedrooms, two bathrooms, one office, one toilet & kitchen & private drain. 28 Harbour View Road, Pukenui
- $7,000Install free- standing sfh 12 Harbour View Road, Pukenui
- $5,600Installation of a solid fuel heater 24 Fitzgerald Road, Pukenui
33 consents
- Fires and heating$7,000
Install free- standing sfh
- Fires and heating$5,600
Installation of a solid fuel heater
- New commercial buildings$1.5m
Rbw - new 5 townhouses (lot 1-5) with 3 levels dwg. Lot 1-5 includes a single gge, two bedrooms, two bathrooms, one office, one toilet & kitchen & private drain.
- Alterations and additions$37k
Rbw - proposed additions & alterations to existing dwg. Internal alterations to bdrm, study, on mid level of existing dwg. New ensuite bathrm to existing bdrm, with new services co
- New homes$700k
Proposed 3-bdrm dwg with wo
- Commercial alterations$22k
COA - construct 5.4 x 4.8m versatile workshop
- Plumbing, drainage and wastewater$13k
Install on-site wastewater system
- New homes$437k
New dwg with solid fuel heater
- Decks, pergolas and verandahs$20k
Deck extension & stairs
- New homes$375k
New dwg with on-site wastewate
- Fires and heating$3,000
Masport r1200 ped free-standing woo
- Alterations and additions$100k
Additions to existing dwg
- Fires and heating$6,500
Installation of a woodsman 'coaster' multifuel wet fire replacing pre-existing appliance
- Garages, sheds and carports$155k
Construct a versatile gge storag
- Alterations and additions$919k
Extension to existing dwg
- Fires and heating$5,000
Install new kent Cardrona woodburner
- Other new buildings$345k
Prefabricated single storey to be c
- Garages, sheds and carports$86k
Gge & deck extension to dwelli
- Garages, sheds and carports$62k
Detached gge & a detached lean
- Fires and heating$4,000
Installation of metro wee rad woody
- Fires and heating$16k
Install a metro tiny ped free-stand
- Relocated buildings$35k
Foundations for prefabricated relocated dwg
- Commercial alterations$81k
Cowie site consent - newly factory built dwg
- Alterations and additions$15k
Rbw - add shower to existing bathrm, new waterproofing & minor plumbing alt.
- New homes$280k
Dwg with attached carport. ...
ResidentialCommercial The dots are this page of the list.
Suburbs in Pukenui
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.