Building consents

Building consents in Fox River

Below: 4 consents we hold in Fox River, searchable and on the map.

Consents we hold41 in the last 12 monthsSearch them ↓

Consents on record in Fox River

Individual building consents we hold, each on its property: 4 from 1 Apr 2025 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. New homes2

    1 in the last 12 months · typically $825k

  2. Alterations and additions2

    typically $40k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

00111202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 0July 2024: 0August 2024: 0September 2024: 0October 2024: 0November 2024: 0December 2024: 0January 2025: 0February 2025: 0March 2025: 0April 2025: 1May 2025: 0June 2025: 0July 2025: 1August 2025: 0September 2025: 1October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 1April 2026: 0May 2026: 0June 2026: 0July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $450kSmall (less than 100 sq m) 2 bdrm timber framed bach on timber piles. Installation of a woodsman kanuka solid fuel burner 62C Kaipakati Point Road

4 consents

  1. New homes$450k

    Small (less than 100 sq m) 2 bdrm timber framed bach on timber piles. Installation of a woodsman kanuka solid fuel burner

    62C Kaipakati Point Road · 1 Mar 2026 · BC250203

  2. Alterations and additions$68k

    Construct il1 outbuilding

    5254 State Highway 6 · 1 Sep 2025 · BC250172

  3. Alterations and additions$12k

    Minor works - partial interior wall removal

    45B Kaipakati Point Road · 1 Jul 2025 · BC250129

  4. New homes$1.2m

    Construction of one main house to be built consisting of 3 pods

    5827 State Highway 6 · 1 Apr 2025 · BC240290

ResidentialCommercial The dots are this page of the list.

Near Fox River

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Buller District Council.