Building consents
Building consents in Waotu
Below: 6 consents we hold in Waotu, searchable and on the map.
Consents on record in Waotu
Individual building consents we hold, each on its property: 6 from 1 Sep 2020 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating2
typically $37k
- Alterations and additions1
1 in the last 12 months · typically $50k
- Garages, sheds and carports1
typically $50k
- New homes1
typically $410k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $50kAlt to the existing bathrm replacing existing fixtures & installing a tile shower. Removal of an internal wall & existing hot water cylinder. New rinnai gas hot water system to be installed 1043 Waotu Road
6 consents
- Alterations and additions$50k
Alt to the existing bathrm replacing existing fixtures & installing a tile shower. Removal of an internal wall & existing hot water cylinder. New rinnai gas hot water system to be installed
- New homes$410k
New 3 bdrm dwg with bathrm, ensuite & laundry (no gge)(building 1). New shed (building 2).
- Fires and heating$8,000
Installation of replacement freestanding solid fuel heater - woodsman Tarras mkiii
- Fires and heating$65k
New 2 bdrm dwg with attached dbl gge. Amendment 1: add solid fuel burner to living room, change hot water supply to gas infinity with gas bottles, change kitchen window liner type to non-combustible product for gas hobs, add in solar PO
- Garages, sheds and carports$50k
Erect a steel framed carport on piles
- Garages, sheds and carports$15k
Total span shed for use as rumpus/storage.
ResidentialCommercial The dots are this page of the list.
Near Waotu
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.