Building consents
Commercial building consents in Mount Creighton
Below: 10 commercial consents we hold in Mount Creighton, searchable and on the map.
Commercial consents on record in Mount Creighton
Individual building consents we hold, each on its property: 10 from 8 Feb 2018 to 23 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New commercial buildings2
1 in the last 12 months · typically $1.5m
- Commercial alterations1
typically $650k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.1mStage 1: proposed two storey dwg with res unit to lower level 4 Picnic Point Lane
10 consents
- New commercial buildings$1.1m
Stage 1: proposed two storey dwg with res unit to lower level
- Commercial alterations$650k
Stage 1 of 2 - Construction of flat/loft above garage with attached carport.
- New commercial buildings$1.9m
Construction of two storey multi unit dwelling and attached garage
- New commercial buildings$495k
Construction of 3 bedroom dwelling with attached garage and first floor flat over garage, onsite waster water disposal
- Commercial alterations$90k
Mount Creighton Station, Glenorchy Road. New farm access bridge (replacing existing)
- Farm buildings$16k
3 Bay Lean-To Haybarn
- Farm buildings$252k
Building A Woolshed And Covered Yards
- Commercial alterations$50k
Public Toilet
- Commercial alterations$80k
ON HOLD Bennetts Bluff, Glenorchy Queenstown Road - Construction of a cantilevered steel and timber viewing platform.
- New commercial buildings$6,500
Erect Telecommunications Station
ResidentialCommercial The dots are this page of the list.
Near Mount Creighton
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.