Building consents
Commercial building consents in Jacks Point
Below: 8 commercial consents we hold in Jacks Point, searchable and on the map.
Commercial consents on record in Jacks Point
Individual building consents we hold, each on its property: 8 from 1 Oct 2019 to 1 Jan 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations3
typically $100k
- New commercial buildings2
2 in the last 12 months · typically $195k
- Farm buildings1
typically $5,000
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $195kConstruction of detached gge with ancillary office (non-habitable) 5 Coopworth Road
- $195kConstruction of detached gge with ancillary office (non-habitable) 5 Coopworth Road
8 consents
- New commercial buildings$195k
Construction of detached gge with ancillary office (non-habitable)
- New commercial buildings$195k
Construction of detached gge with ancillary office (non-habitable)
- Commercial alterations$40k
Alt to dwg - additional office space added & wardrobe extended. Cladding to match existing. - 5 rockburn lane, Jacks Point
- Farm buildings$5,000
Install woodsman serene fire - 5 woolshed Rd, hanley's farm
- Commercial alterations$100k
Add to rear of dwg for new bdrm, ensuite & office - 10a kinross lane, Jacks Point
- Commercial alterations$350k
Alterations & additions to existing dwg - includes joinery, terrace, outdoor fireplace, bdrm, bathrm & office - 18 Jacks Point rise, Jacks Point
- Commercial alterations$100k
Construction of single level detached art studio with an office space & bathrm
- New commercial buildings$1.3m
Construction of single level detached dwg with attached dbl gge & detached office
ResidentialCommercial The dots are this page of the list.
Near Jacks Point
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.