Building consents
Commercial building consents in Raetihi
Below: 7 commercial consents we hold in Raetihi, searchable and on the map.
Commercial consents on record in Raetihi
Individual building consents we hold, each on its property: 7 from 1 Oct 2021 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations3
1 in the last 12 months · typically $22k
- Fit-outs2
1 in the last 12 months · typically $60k
- Relocated buildings1
typically $99k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $64k14.0m long x 4.8m wide gge/workshop 44 Queen Street, Raetihi
- $60kHousing (multi-unit dwg) - internal alterations to create 2 additional units on upper level, new internal access door between tenancy at ground floor level +more 9 Queen Street, Raetihi
7 consents
- Fit-outs$60k
Housing (multi-unit dwg) - internal alterations to create 2 additional units on upper level, new internal access door between tenancy at ground floor level +more
- Commercial alterations$64k
14.0m long x 4.8m wide gge/workshop
- Commercial alterations$5,000
Installation of bathrm, toilet & laundry in existing workshop amendment 1: workshop kitchenette. Protected wall between kitchen & permitted multifuel heater. Replace hot water cylinder with lpg water heating. Revised ceiling joists. Toilet vanity
- Commercial alterations$22k
Installation of bathrm, toilet & laundry in existing workshop
- Relocated buildings$99k
Rbw - dwg to be relocated from Onehunga & linked to existing dwg. Alterations to both existing & relocated dwg to create four bdrm, two bathrm, two office, l
- Fit-outs$60k
New two bay shed with small bathrm fit-out
- Commercial alterations$45k
Construction of a concrete pad & sheds4u kitset 2-bay pole gge/workshop + open sided woodshed
ResidentialCommercial The dots are this page of the list.
Suburbs in Raetihi
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.