Building consents
Building consents in Horopito
Below: 25 consents we hold in Horopito, searchable and on the map.
Consents on record in Horopito
Individual building consents we hold, each on its property: 25 from 1 May 2020 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes6
1 in the last 12 months · typically $323k
- Fires and heating3
2 in the last 12 months · typically $7,200
- Plumbing, drainage and wastewater2
1 in the last 12 months · typically $22k
- Alterations and additions2
typically $110k
- Garages, sheds and carports1
1 in the last 12 months · typically $100k
- Minor dwellings and sleepouts1
1 in the last 12 months · typically $350k
- Multiple homes1
typically $3.3m
- Pools and spas1
typically $50k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $623k4 bdrm res dwg with living, dining & kitchen with woodsman fire 6 Horopito Heights
- $350kNew small 1 bdrm cabin, concrete slab, with timber framed construction above. New septic tank with onsite discharge to land.
- $100kConstruct a 13m x 9m x 3m totalspan gge 5 Hutiwai Road
- $38kTo relocate a second hand 3 bdrm dwg. Foundation & drainage & installation of a 116 Matapuna Road
- $8,000Install freestanding forenzo lady kitchener uleb leg black wood burner & new flue kit 6436 State Highway 4
25 consents
- Minor dwellings and sleepouts$350k
New small 1 bdrm cabin, concrete slab, with timber framed construction above. New septic tank with onsite discharge to land.
- New homes$623k
4 bdrm res dwg with living, dining & kitchen with woodsman fire
- Fires and heating$7,200
Iinstall pyro classic freestanding fire
- Garages, sheds and carports$100k
Construct a 13m x 9m x 3m totalspan gge
- Plumbing, drainage and wastewater$38k
To relocate a second hand 3 bdrm dwg. Foundation & drainage & installation of a
- Fires and heating$8,000
Install freestanding forenzo lady kitchener uleb leg black wood burner & new flue kit
- Plumbing, drainage and wastewater$5,000
Construct new toilet to first floor inside of existing building
- New homes$260k
New 3 bdrm transportable dwg
- New homes$385k
New 2 bdrm dwg, 1 bathrm with masport fire & attached single gge
- Alterations and additions$100k
New 50.88 mono pitch dwg. 1 bathrm & 1 kitchen.
- Pools and spas$50k
Swimming pool fence
- New homes$198k
Stage 1 - 1 bdrm dwg with solid fuel heater
- New homes$74k
Foundation & drainage for a new transportable dwg
- Multiple homes$3.3m
Rbw new 2 storey multi unit res development. 3 multi unit block, 5 multi unit block & 1 detached unit. Total 9 units. Each unit consists of 2 bedrooms & 2 bath.
- Alterations and additions$120k
Rbw - alt to existing bathrm incorpating new laundry cupboard. New bathrm, new sliding door stackers to outside of ext wall. New kitchen.
- Fires and heating$6,500
Solid fuel heater - woodsman Tarras mk ii
- New homes$800k
3 bedroomed certified passive house & stand alone dbl gge & workshop
- New homes$480k
Single level, 3 bdrm dwg, with 2 bathrooms, kitchen & attached dbl gge & freestanding wood fire with wetback hot water system
- Alterations and additions$35k
Site works for 3 bdrm modular transportable dwg
- New homes$550k
Construct a 3 bdrm home with attic
- Garages, sheds and carports$110k
Family room add plus new stand alone gge & woodshed
- Alterations and additions$50k
New transportable 3 bed dwg with new ccc from Waipa District dc. New site connections + fire
- Fires and heating$6,000
Solid fuel heater - metro eco trend insert with fan
- Garages, sheds and carports$57k
New 10.5 x 8 x 3 gge
- Minor dwellings and sleepouts$367k
New dwg + gge + sleepout
ResidentialCommercial The dots are this page of the list.
Near Horopito
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.