Building consents
Building consents in Tasman
Below: 3,924 consents we hold in Tasman, searchable and on the map.
Consents on record in Tasman
Individual building consents we hold, each on its property: 3,924 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating849
192 in the last 12 months · typically $6,000
- New homes715
135 in the last 12 months · typically $495k
- Alterations and additions633
125 in the last 12 months · typically $45k
- Garages, sheds and carports152
23 in the last 12 months · typically $45k
- Pools and spas119
14 in the last 12 months · typically $65k
- Plumbing, drainage and wastewater92
20 in the last 12 months · typically $17k
- Minor dwellings and sleepouts66
16 in the last 12 months · typically $64k
- Decks, pergolas and verandahs59
6 in the last 12 months · typically $45k
- Relocated buildings50
9 in the last 12 months · typically $97k
- Multiple homes35
10 in the last 12 months · typically $1m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $4.3mRbw - construction of thirteen terrace house units & one stand-alone house. All units two storeys, 2-3 bedrooms, one bathrm & one ensuite. One laundry, kitchen per unit. Associated driveways, fo 6 Heaphy Street, Richmond
- $3mRbw - 8 new household units + two storeys + two bedrooms with one bathrm & one ensuite + studies to unit 6-8 + with timber & block retaining walls + private drainage + onsite ww system. 118 Aranui Road, Māpua
- $2.8mNew 2 story dwg (x6), each with kitchen, dining, living, family area, 3 t&b, 3 bedrooms, single gge, laundry & private drainage. Resubmission of refused consent bco10398309 8 Gibbs Road, Collingwood
- $2.5mPbc e2e - rbw - six new two-storey dwgs. Lot 1 & 2 each with three bedrooms & two & a half bathrooms; lots 3-6 each with four bedrooms, two & a half bathrooms & attached single gge. 3 Churchill Avenue, Richmond
- $2.1mRbw - proposed 3x2 storey standalone dwgs. Lot 1 & lot 3 with 4 bedrooms, 3 bathrooms,1 wc & single gge. Lot 2 with 4 bedrooms, 2 bathrooms, 1 wc & single gge. Includes retaining wall 13 Lagoon Street, Torrent Bay
3,924 consents
- Commercial alterations$125k
Enclose porch, alt internal layout, install ensuite, sink & wall lining to basement office, insulate exterior walls of dwg
- Fires and heating$7,000
Install solid fuel burner in dwg
- Garages, sheds and carports$40k
Construction of a 6m x 5m Versatile gge
- Fires and heating$3,500
Fireplace freestanding only using an exisiting flue
- Fires and heating$7,000
Yunca monte base fire
- New homes$553k
Construct dwg with internal access gge
- New homes$621k
Construct dwg with internal access gge
- New homes$627k
Construct dwg with internal access gge
- Fires and heating$6,000
Install freestanding wood burner
- Fires and heating$7,000
Install freestanding wood burner
- Plumbing, drainage and wastewater$16k
Install pump & septic system with effluent field
- Fires and heating$160k
Alt bathrm & wall between living & dining rooms, install solid fuel burner in dwg
- Alterations and additions$20k
Ensuite renovation
- New homes$465k
260410 - lot 2 - construction of a freestanding dwg with attached gge
- Alterations and additions$60k
260617 - lot 5 - internal alt to ground floor existing bathrooms. Removing existing walls, replacing & adding new plumbing fixtures.
- Alterations and additions$30k
Rbw - housing (detached dwg) - internal alterations to the laundry, including new walls, installation of a shower & relocation of the cavity slider door
- Alterations and additions$3,000
Pyro uleb freestanding logburner 47 Gladstone Rd Woodend lot 4 dp 63473
- New homes$850k
Construction of single storey dwg with attached gge
- Alterations and additions$15k
Rbw-replacing foundation piling & foundation walls
- Multiple homes$1.6m
Rbw - 4 x new dbl storey dwgs, lot 1 includes 4 bedrooms & 2.5 bathrooms; lot 2 to lot 4 include 3 bedrooms & 2 bathrooms. Each lot includes new private drainage, attached gge & retain
- Alterations and additions$50k
Alt to existing timber truss.
- Fires and heating$4,000
Fixed fee sfh - install replacement insert woodfire & flue into existing fireplace - metro smart insert.
- Alterations and additions$3,000
Installed shower over bath with tiled surround, relocated
- Alterations and additions$105k
Sips add to existing sips house
- Fires and heating$6,800
Fireplace freestanding to supply & install a new metro tiny woody freestanding wood burner
ResidentialCommercial The dots are this page of the list.
Towns and cities in Tasman
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.