Building consents
Building consents in Reporoa
Below: 53 consents we hold in Reporoa, searchable and on the map.
Consents on record in Reporoa
Individual building consents we hold, each on its property: 53 from 1 Jul 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating19
3 in the last 12 months · typically $6,500
- Alterations and additions6
typically $15k
- Garages, sheds and carports5
typically $45k
- New homes4
1 in the last 12 months · typically $410k
- Commercial alterations2
1 in the last 12 months · typically $66k
- Plumbing, drainage and wastewater2
1 in the last 12 months · typically $26k
- Relocated buildings2
typically $38k
- Minor dwellings and sleepouts1
typically $4,000
- Retaining walls1
typically $50k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $350kQLCHT - construction of single storey dwg with attached gge 10 Guthrie Road, Reporoa
- $80kPrefabrication dwg constructed in aflex homes factory & relocated to the site on the district on a separate consent (bc250105). This consent is for wastewater, stormwater, house piles, & the joist & piles of deck & landing only. 150 Deep Creek Road, Reporoa
- $32kInstall a waste water treatment & sewage system 375 Ohakuri Road, Ohakuri
- $7,000Install metro Ltd smart insert fire 2954 State Highway 5, Reporoa
- $6,800Installation of a maxen kinmont350 woody woodburner complete with a maxen flue kit/shield. A pan flashing & dektite rubber boot flashing to be installed around external flue through roof 3355 Broadlands Road, Reporoa
53 consents
- Fires and heating$6,800
Installation of a maxen kinmont350 woody woodburner complete with a maxen flue kit/shield. A pan flashing & dektite rubber boot flashing to be installed around external flue through roof
- Plumbing, drainage and wastewater$32k
Install a waste water treatment & sewage system
- Commercial alterations$80k
Prefabrication dwg constructed in aflex homes factory & relocated to the site on the district on a separate consent (bc250105). This consent is for wastewater, stormwater, house piles, & the joist & piles of deck & landing only.
- New homes$350k
QLCHT - construction of single storey dwg with attached gge
- Fires and heating$7,000
Install metro Ltd smart insert fire
- Fires and heating$5,000
Install woodsman coleridge freestanding woodburner
- Fires and heating$7,863
Installation of new yunca monte base - rural - freestanding
- Alterations and additions$25k
Bathrm alterations
- Fires and heating$6,500
Freestanding - install metro wee rad free standing wood fire
- New homes$570k
3 bdrm dwg with attached gge dwg
- New homes$195k
Build a simple res dwg on tc2 mbie technical
- Commercial alterations$52k
New gge/workshop
- Fires and heating$4,500
Masport r1200 freestanding fire
- Fires and heating$4,500
Metro wee rad freestanding sfh
- Fires and heating$7,000
Install masport r5000 freestanding fire on existing wetback
- Garages, sheds and carports$39k
New dbl gge
- Alterations and additions$5,000
**fast track amendment to building consent - building
- Alterations and additions$5,000
Change cladding, change roof line to include gable end
- Alterations and additions$700k
Extension to dwg
- Fires and heating$8,000
firenzo Bronte freestanding fire
- Fires and heating$6,500
Install wagener sparky multifuel freestanding fire
- Retaining walls$50k
Construct retaining wall
- Garages, sheds and carports$375k
Construction of a detached gge.
- Fires and heating$6,500
Masport osburn 1600 freestanding fire
- Minor dwellings and sleepouts$4,000
Install 2nd hand stovax studio 2 inbuilt woodfire
ResidentialCommercial The dots are this page of the list.
Suburbs in Reporoa
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.